Insert the forks all the way through the base. DO NOT insert forks partially into the base to
move the cabinet.
•
Fork may be partially inserted into the front or rear fork lift slots for minor positioning if the
forks are kept in a horizontal position with no upward angling.
•
DO NOT use the forklift slots on the end of the cabinet to move the cabinet.
If these instructions are not followed, damage to the wiring channel and wiring will occur.
NOTE
For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the
cabinet (see Table 3-1 on page 12 for cabinet weight).
1.
If not already accomplished, use a forklift or pallet jack to move the cabinet to the installation area,
or as close as possible, before unloading from the pallet. Insert the forklift or pallet jack forks from
the right side of the cabinet, between the supports on the bottom of the pallet (see Figure 3-12 on
page 24 for the location of the UPS cabinet center of gravity).
2.
Remove the three bolts securing the left side shipping bracket to the cabinet and three bolts
securing the bracket to the pallet (see Figure 4-1). Remove the left shipping bracket. If permanently
mounting the cabinet, retain the shipping bracket and securing hardware for later use.
3.
Remove the three bolts securing the right side shipping bracket to the cabinet and three bolts
securing the bracket to the pallet (see Figure ). Remove the right shipping bracket. If permanently
mounting the cabinet, retain the shipping bracket and securing hardware for later use.
4.
Using the forklift, raise the UPS cabinet section until the cabinet bottom clears the pallet by
approximately 3 mm.
5.
Once the UPS cabinet is clear of the pallet, pull the pallet from under the UPS cabinet. Discard or
recycle the pallet in a responsible manner.
6.
Using the forklift, move the UPS cabinet to the final installation location.
7.
Carefully lower the UPS cabinet until the cabinet base contacts the floor.
8.
If permanently mounting the system, proceed to the next step; otherwise, continue to Step 11.
9.
Using the retained hardware, reinstall the shipping brackets removed in Steps 2 and 3 to the left
and right side of the UPS cabinet with the angle facing outward (see Figure 4-1 and Figure 4-2).
10. Secure the cabinet to the floor with customer-supplied hardware.
11. If installing a field-installed UPM (FI-UPM), proceed to Section 4.3; otherwise, proceed to Step 12.
12. If installing a battery system, proceed to Section 4.6; otherwise, proceed to Step 13.
13. If installing a tie cabinet or distribution panel for a distributed bypass system, proceed to Section
5.2; otherwise, proceed to Section 4.7.
Содержание Power Xpert 9395P
Страница 1: ...User s and Installation Guide Power Xpert 9395P UPS 500 kVA 600 kVA P 164000476 ...
Страница 2: ...P 164000476 9395P 500kVA 600 kVA 2 Revision 002 User s and Installation Guide ...
Страница 18: ...P 164000476 9395P 500kVA 600 kVA 8 Revision 002 User s and Installation Guide ...
Страница 37: ...P 164000476 9395P 500kVA 600 kVA 27 Revision 002 User s and Installation Guide ...