UPS SYSTEM INSTALLATION
Power Xpert
9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
164201710 Rev 7
www.eaton.com/powerquality
4-30
Distributed Bypass Installation Checklist
Each cabinet in the distributed bypass system is placed in its installed location.
All conduits and cables are properly routed to the UPS cabinets and to the tie cabinet or distribution panel.
All power cables are properly sized and terminated.
A ground conductor is properly installed.
Controller Area Network (CAN) wiring between the UPS cabinets is properly installed.
Pull-chain wiring between the UPS cabinets is properly installed.
Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets.
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.
Содержание Power Xpert 9395 Plus
Страница 1: ...Power Xpert 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Power Xpert 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual...
Страница 215: ......
Страница 216: ...1642017107 164201710 7...