UPS INSTALLATION PLAN AND UNPACKING
Power Xpert
9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
164201710 Rev 7
www.eaton.com/powerquality
3-13
Table 3‐9. Supplied Terminal Hardware Kit
Part
Size
Quantity
Terminals Used On
Eaton Part Number
Bolt, Grade 5
M10 x 30 mm
12
Ground and Neutral
180190078-088
Bolt, Grade 5
M12 x 45 mm
26
Rectifier Input, Bypass Input,
Battery Input, and Output
180190078-113
Flat Washer
M10
12
Ground and Neutral
180500036-100
Flat Washer
M12
52
Rectifier Input, Bypass Input,
Battery Input, and Output
180500036-120
Conical Washer
M10
12
Ground and Neutral
180500037-100
Conical Washer
M12
26
Rectifier Input, Bypass Input,
Battery Input, and Output
180500037-120
Nut
M12
26
Rectifier Input, Bypass Input,
Battery Input, and Output
180200001-07
Table 3‐10. Recommended Installation Parts and Tools (Not Supplied by Eaton
)
Part
Size
Quantity
Manufacturer
Part Number
Notes
Long Barrel 2‐Hole Lug
2/0 AWG
As required
Thomas & Betts
54862BE
3/0 AWG
Thomas & Betts
54864BE
4/0 AWG
Thomas & Betts
54866BE
250 MCM
Thomas & Betts
54868BE
300 MCM
Thomas & Betts
54870BE
350 MCM
Thomas & Betts
54872BE
400 MCM
Thomas & Betts
54874BE
500 MCM
Thomas & Betts
54876BE
Manual Hydraulic Crimp Tool
14 Ton
1
Thomas & Betts
TBM14M
Die Set
N/A
1
Thomas & Betts
15506
Table 3‐11. Separate Rectifier Input UPM Power Cable Terminations for the Power Xpert 9395-275/225 and 9395-275/275
Terminal Function
Terminal
Function
Size of Pressure Termination
Tightening Torque
Nm (lb ft)
Type Screw
AC Input to each UPM Rectifier
E1
Phase A
2 - #6-250 kcmil
42.4 (375)
5/16
”
Hex
E2
Phase B
2 - #6-250 kcmil
42.4 (375)
5/16
”
Hex
E3
Phase C
2 - #6-250 kcmil
42.4 (375)
5/16
”
Hex
Conduit sizes were chosen from NEC Table 4, Electrical Metallic Tubing (EMT). See
Table 3‐12 for conduit requirements.
Per NEC article 300, 3(B)(1), all three‐phase conductors must be run in the same
conduit. Neutral and ground must be run in the same conduit as the phase
conductors.
Conduit is sized to accommodate one neutral conductor the same size as the phase
conductor and one ground conductor sized in accordance with NEC Table 250.122.
Conduit sizes listed are for copper wiring only.
Содержание Power Xpert 9395 Plus
Страница 1: ...Power Xpert 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Power Xpert 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual...
Страница 215: ......
Страница 216: ...1642017107 164201710 7...