UPS SYSTEM INSTALLATION
Power Xpert
9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
164201710 Rev 7
www.eaton.com/powerquality
4-2
NOTE
For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the
cabinet (see Table 3‐1 on page 3-2 for cabinet weight).
1.
If not already accomplished, use a forklift or pallet jack to move the cabinet to the
installation area, or as close as possible, before unloading from the pallet. If
possible, move the cabinet using the pallet. Insert the forklift or pallet jack forks
from the right side of the pallet (facing the cabinet), between the supports on the
bottom of the pallet (see Figure 3‐6 on page 3-6 for the UPS cabinet center of
gravity measurements). If the cabinet must be moved using the cabinet front or
rear fork lift slots, see the caution statement at the beginning of this procedure.
2.
Remove the three bolts securing the left side shipping bracket to the cabinet and
three bolts securing the bracket to the pallet (see Figure 4‐1). Remove the left
side shipping bracket. If installing the cabinet permanently, retain the shipping
bracket and securing hardware for later use.
3.
Remove the three bolts securing the right side shipping bracket to the cabinet
and three bolts securing the bracket to the pallet (see Figure 4‐2). Remove the
right side shipping bracket. If installing the cabinet permanently, retain the
shipping bracket and securing hardware for later use.
4.
Using a forklift (see the caution statement at the beginning of this procedure),
raise the UPS cabinet section until the cabinet bottom clears the pallet by
approximately 3 mm (1/8
”
).
5.
Pull the pallet from under the UPS cabinet. Discard or recycle the pallet in a
responsible manner.
6.
Using a forklift (see the caution statement at the beginning of this procedure),
move the UPS cabinet to the final installed location.
7.
Carefully lower the UPS cabinet until the cabinet base contacts the floor.
8.
If permanently mounting the system, proceed to Step ; otherwise, continue to
Step 11.
9.
Using the retained hardware, reinstall the shipping brackets removed in Steps 2
and 3 to the left and right side of the UPS cabinet with the angle facing outward
(see Figure 4‐1 and Figure 4‐2).
10.
Secure the cabinet to the floor with customer-supplied hardware.
11.
If installing a battery system, proceed to paragraph 4.3; otherwise, proceed to
Step 12.
12.
If installing a tie cabinet or distribution panel for a distributed bypass system,
proceed to paragraph 4.4; otherwise, proceed to paragraph 4.5.
Содержание Power Xpert 9395 Plus
Страница 1: ...Power Xpert 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Power Xpert 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual...
Страница 215: ......
Страница 216: ...1642017107 164201710 7...