Powering down/up applications (examples)
Servicing the Network Management Module – 168
Non-priority equipment immediately shuts down when on battery for 10s to keep battery power for critical equipment.
4.3.3 Restart sequentially the IT equipment on utility recovery
4.3.3.1 Target
Restart the storage first (right after utility recovery), database servers next (2min after utility recovery) and applications last (3min
after utility recovery).
4.3.3.2 Step 1: Installation setup
4.3.3.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).
Содержание Network-M2
Страница 1: ...UPS Network Management Card Network M2 User s Guide English 10 15 2020 2 0 5 ...
Страница 2: ......
Страница 24: ...Configuring Modbus Installing the Network Management Module 24 ...
Страница 25: ...Configuring Modbus Installing the Network Management Module 25 ...
Страница 26: ...Configuring Modbus Installing the Network Management Module 26 ...
Страница 38: ...Home Contextual help of the web interface 38 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode ...
Страница 40: ...Home Contextual help of the web interface 40 3 2 7 2 3 Battery mode 3 2 7 2 4 Off mode ...
Страница 42: ...Home Contextual help of the web interface 42 3 2 7 3 2 Bypass mode 3 2 7 3 3 Battery mode ...
Страница 43: ...Home Contextual help of the web interface 43 3 2 7 3 4 HE mode ESS mode 3 2 7 3 5 Maintenance bypass mode ...
Страница 64: ...Protection Contextual help of the web interface 64 Example 2 Immediate OFF Example 4 Custom ...
Страница 65: ...Protection Contextual help of the web interface 65 Settings 1 ...
Страница 261: ...Acronyms and abbreviations Information 261 ...
Страница 268: ......