Powering down/up applications (examples)
Servicing the Network Management Module – 165
4.3.2 Powering down non-priority equipment first
4.3.2.1 Target
Powering down non-priority equipment first (immediately) and keep battery power for critical equipment.
Powering down critical equipment 3min before the end of backup time.
4.3.2.2 Step 1: Installation setup
4.3.2.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).
Load segmentation also allows IT equipment to restart sequentially on utility recovery (
Содержание Network-M2
Страница 1: ...UPS Network Management Card Network M2 User s Guide English 10 15 2020 2 0 5 ...
Страница 2: ......
Страница 24: ...Configuring Modbus Installing the Network Management Module 24 ...
Страница 25: ...Configuring Modbus Installing the Network Management Module 25 ...
Страница 26: ...Configuring Modbus Installing the Network Management Module 26 ...
Страница 38: ...Home Contextual help of the web interface 38 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode ...
Страница 40: ...Home Contextual help of the web interface 40 3 2 7 2 3 Battery mode 3 2 7 2 4 Off mode ...
Страница 42: ...Home Contextual help of the web interface 42 3 2 7 3 2 Bypass mode 3 2 7 3 3 Battery mode ...
Страница 43: ...Home Contextual help of the web interface 43 3 2 7 3 4 HE mode ESS mode 3 2 7 3 5 Maintenance bypass mode ...
Страница 64: ...Protection Contextual help of the web interface 64 Example 2 Immediate OFF Example 4 Custom ...
Страница 65: ...Protection Contextual help of the web interface 65 Settings 1 ...
Страница 261: ...Acronyms and abbreviations Information 261 ...
Страница 268: ......