Page 11
SK-90510-Y4_EN
ENGLISH
4. Power cables connection
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the upstream protection device (Normal AC source)
is open "O" (Off).
Before proceeding to connect the HotSwap MBP to the UPS, make sure the UPS has been properly shut
down (refer to the UPS user manual).
Always connect the ground wire first.
4.1 MBP6Ki
1. Connect the 2 power cables of I/O cord Set
(1)
to the UPS I/O terminal blocks, following color coding on
the cables and the UPS I/O cover (blue for UPS Input / red for UPS Output) – refer to the UPS user manual
to check the UPS terminal blocks connection.
2. Connect the MBP detection cable from the I/O cord Set
(1)
to the specific UPS connector
(MBP detect, refer to UPS User Manual).
Only with compatible EATON UPS, contact your Eaton reseller for more information.
3. Slide the MBP I/O cover
(2)
after removing the 4 screws, to access to MBP terminal blocks.
4. Insert the Normal AC source cable through the cable gland.
5. Connect the wires to the Normal AC source (Input) terminal blocks.
6. Insert the Output cable through the cable gland.
7. Connect the wires to the Output terminal blocks.
8. Tighten the cable glands.
9. Slide back and secure the MBP I/O cover
(2)
with the 4 screws.
10. Connect the I/O cord Set
(1)
connector to the MBP, and secure it by fixing the 2 locking screws.
1
2
Utility
Power
Load
to UPS output
to UPS input
OUTPUT
L1 N
t
INPUT
L1 N
t
2
OUTPUT
L1 N
t
INPUT
L1 N
t
Output cable
Normal AC Source
cable
2
RJ11 MBP detection
Содержание MBP11Ki
Страница 20: ...Page 20 SK 90510 Y4_EN...