Fault close

1.  It is not recommended that operations be made on 

known faults.

2.  If a fault is experienced, the connector and bushings 

must be replaced.

Loadbreak operation

Area must be clear of obstructions or contaminants that 

would interfere with this operation.
Secure connector operating eye firmly onto clampstick and 

lock.
Thrust clampstick 

forward

 until the connector moves 

approximately 1/4" (5 mm) further onto the bushings. This 

action will break any surface friction between outer surfaces 

of bushings and inner surfaces of connector interfaces. The 

yellow latch indicator rings on the bushings should now be 

visible in the cuff windows of the connector.
Looking away from the connector, pull the clampstick and 

withdraw the connector from bushings with a fast, firm, 

straight motion. Minimum amount of travel of connector to 

break load is 9" (230 mm).
Using the clampstick, move the connector away from 

the bushings and place the metallic portion of one of the 

probes directly onto a ground plane. This will discharge 

any capacitive charge that may still be on the probes. 

Alternatively, the "C" connecter can be mated directly with 

the Cleer standoff bushing to discharge any capacitive 

charge that may still be on the probe.

Place an insulated protective cap with ground wire attached 

to system ground on the exposed energized bushings using 

clampstick. 

 WARNING 

High Voltage. If the fiberglass contact tube of one or 

both loadbreak bushing(s) extends forward, the unit 

MUST be replaced. Failure to comply could cause 

thermal runaway failure or failure to successfully fault-

close; this may result in serious personal injury.

6

CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS 

   MN650019EN   March 2016

Содержание COOPER POWER Cleer Series

Страница 1: ...00 A 15 25 and 28 kV class Cleer loadbreak connector system installation instructions COOPER POWER SERIES Loadbreak Apparatus Connectors MN650019EN Effective March 2016 Supersedes S600 100 1 March 201...

Страница 2: ...NY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES In no...

Страница 3: ...3 In line bracket installation instructions 3 Square bracket installation instructions 4 OPERATING INSTRUCTIONS Loadmake operation 5 Fault close 6 Loadbfreak operation 6 CABLE ISOLATION AND GROUNDING...

Страница 4: ...afety information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal injury Follow all locally approved safety procedures when working around high and low volt...

Страница 5: ...ng a visible ground It is then safe to perform work on the underground cable Read this manual first Read and understand the contents of this manual and follow all locally approved procedures and safet...

Страница 6: ...OL T and 1 T OP II or BT TAP termination T OP II OR BT TAP TERMINATION BOL T TERMINATION SOURCE LOAD Figure 4 600 A loadbreak connector system with 2 BOL T terminations Figure 5 600 A loadbreak connec...

Страница 7: ...ding to location marks made in Step 2 Step 4 With pivot support mounting feet assembly secure using supplied 5 16 hardware mount bracket with junction to pivot support mounting feet Step 5 Adjust brac...

Страница 8: ...tes of enclosure See Figure 9 Note N The assembly should be secured with four 4 bolts using one upper and lower slot on each side of the bracket Step 2 Using supplied grounding clamps connect bracket...

Страница 9: ...te 200 A loadbreak or 600 A deadbreak products to Cleer 600 A loadbreak bushings Failure to comply could lead to a fault that may result in death or serious injury WARNING High Voltage Do not close or...

Страница 10: ...gs with a fast firm straight motion Minimum amount of travel of connector to break load is 9 230 mm Using the clampstick move the connector away from the bushings and place the metallic portion of one...

Страница 11: ...source side loadbreak bushing See Figure 13 Figure 12 Remove C LCN connector LOAD SOURCE REMOVE LCN BOL T TERMINATION T OP II OR BT TAP TERMINATION Figure 13 Install 600 A loadbreak protective cap LOA...

Страница 12: ...and obtain good footing Slam the elbow onto the bushing with one quick and continuous motion Figure 14 Remove 200 A loadbreak protective cap SOURCE 200 A LOADBREAK REDUCING TAP PLUG LOAD 200 A LOADBR...

Страница 13: ...last operation push on the clampstick to seat the elbow all the way onto the bushing again This insures that the elbow is latched and was not dislodged during the latch ing check in previous step abo...

Страница 14: ...st firm straight motion Minimum amount of travel of connector to break load is 9 230 mm See Figure 18 Using the clampstick move the connector away from the bushings and place the metallic portion of o...

Страница 15: ...gh the load side 600 A loadbreak bushing interface to verify circuit is de energized See Figure 20 Step 6 Install grounding elbow If circuit is de energized install Cleer 600 A 15 25 kV grounding elbo...

Страница 16: ...7 25 6 649 5 00 127 4 00 101 6 8 93 226 8 2 04 51 8 26 88 682 8 CONFIGURATION 1 CONFIGURATION 2 CONFIGURATION 3 Figure 22 In line mounting configurations and dimensions Mounting configurations and dim...

Страница 17: ...5 mm 4 00 101 6 mm 3 55 90 2 mm 5 0 127 3 0 76 10 5 264 11 5 292 3 55 90 2 7 90 200 7 15 30 388 6 4 0 101 6 12 79 324 9 10 21 259 3 7 0 178 3 5 89 1 5 38 12 0 8 20 mm 2 0 51 mm 7 0 178 mm 7 0 178 mm 1...

Страница 18: ...This page intentionally left blank 14 CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS MN650019EN March 2016...

Страница 19: ...This page intentionally left blank 15 CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS MN650019EN March 2016...

Страница 20: ...ates Eaton com cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No MN650019EN Rev 00 Replaces S6001001 Rev 04 Eaton is a registered trademark All trademarks are property of...

Отзывы: