1. Assemble strain relief into the end piece with
the hole.
2. A Slide the bushing onto the cable.
B Insert the cable into the strain relief.
3. Prepare the cable according to the drawing.
4. Insert the wire per channel into the cable
clamps of each connector, check the channel
numbering and the pin numbering of the XLR:
1
= shield
2 + 3
= signal wires
Q
Q
A
B
1
2
L
max
for Size
1 = 180 mm [7.0”]
2 = 300 mm [11.8”]
3 = 420 mm [16.5”]
4 = 540 mm [21.3”]
3
4
ASSEMBLY INSTRUCTION
NSB*- Stage box
Modular Connector Box System
|
Page 1