background image

Product information

Introduction

Eaton's Cooper Power series Cleer™ loadbreak connector 

system is a 600 A loadbreak device available in ratings for 

operation on 15, 25, and 28 kV class systems. It is used to 

provide a visible break and visible ground on 600 A network 

and distribution systems without having to remove 600 A 

terminations and move heavy cable. The Cleer loadbreak 

connector system is fully shielded, submersible and meets 

the applicable requirements of IEEE Std 386™-2006 

standard – “Separable Insulated Connector Systems”.
Many configurations are possible with this connector 

system. Under normal operating conditions, the current path 

is through one of the 600 A loadbreak/deadbreak 2-position 

junctions (DLJ6_ _), through the 600 A loadbreak “C” 

(LCN) connector and through the second 600 A loadbreak/

deadbreak junction. 
When isolating underground cable, with the system 

energized or de-energized, with or without rated load 

current, with the use of a clampstick, the LCN connector 

can be removed. A 600 A loadbreak protective cap 

(LPC6_  _) can then be installed on the two exposed 

loadbreak interfaces. All bushings of the connector system 

are then insulated and deadfront. When a 600 A termination 

with a 200 A reducing tap plug is used on the IEEE Std 

386™-2006 standard 600 A 15/25 kV deadbreak interfaces 

of the junction, a direct conductor test can be performed. 

A Cleer grounding elbow can then be installed on the 600 

A loadbreak interfaces providing a visible ground. It is then 

safe to perform work on the underground cable.

Read this manual first

Read and understand the contents of this manual and follow 

all locally approved procedures and safety practices before 

installing or operating this equipment

Additional information

These instructions cannot cover all details or variations 

in the equipment, procedures, or process described nor 

provide directions for meeting every possible contingency 

during installation, operation, or maintenance. When 

additional information is desired to satisfy a problem not 

covered sufficiently for the user's purpose, please contact 

your Eaton representative.

Acceptance and initial inspection

Each connector is completely inspected and tested at the 

factory. It is in good condition when accepted by the carrier 

for shipment. Upon receipt of a connector, inspect the 

connector thoroughly for damage and loss of parts incurred 

during shipment. If damage or loss is discovered, file a 

claim with the carrier immediately.

Handling and storage

If the connector is to be stored for an appreciable time 

before installation, provide a clean, dry storage area. Locate 

the connector so as to minimize the possibility of physical 

damage.

Quality standards

ISO 9001 Certified Quality Management System

Figure 1.  600 A Cleer loadbreak connector system with 

in-line bracket (15 kV shown).

600 A 

LOADBREAK 

CONNECTOR 

(LCN)

600 A, 15 kV 

LOADBREAK BUSHING

600 A, 15/25 kV 

DEADBREAK 

BUSHING

IEEE Std 

386™ -2006 

STANDARD

600 A, 15/25 kV 

DEADBREAK 

BUSHING

IEEE Std 

386™ -2006 

STANDARD

600 A, 15 kV LOADBREAK 

BUSHING

1

CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS 

   MN650019EN   March 2016

Содержание COOPER POWER Cleer Series

Страница 1: ...00 A 15 25 and 28 kV class Cleer loadbreak connector system installation instructions COOPER POWER SERIES Loadbreak Apparatus Connectors MN650019EN Effective March 2016 Supersedes S600 100 1 March 201...

Страница 2: ...NY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES In no...

Страница 3: ...3 In line bracket installation instructions 3 Square bracket installation instructions 4 OPERATING INSTRUCTIONS Loadmake operation 5 Fault close 6 Loadbfreak operation 6 CABLE ISOLATION AND GROUNDING...

Страница 4: ...afety information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal injury Follow all locally approved safety procedures when working around high and low volt...

Страница 5: ...ng a visible ground It is then safe to perform work on the underground cable Read this manual first Read and understand the contents of this manual and follow all locally approved procedures and safet...

Страница 6: ...OL T and 1 T OP II or BT TAP termination T OP II OR BT TAP TERMINATION BOL T TERMINATION SOURCE LOAD Figure 4 600 A loadbreak connector system with 2 BOL T terminations Figure 5 600 A loadbreak connec...

Страница 7: ...ding to location marks made in Step 2 Step 4 With pivot support mounting feet assembly secure using supplied 5 16 hardware mount bracket with junction to pivot support mounting feet Step 5 Adjust brac...

Страница 8: ...tes of enclosure See Figure 9 Note N The assembly should be secured with four 4 bolts using one upper and lower slot on each side of the bracket Step 2 Using supplied grounding clamps connect bracket...

Страница 9: ...te 200 A loadbreak or 600 A deadbreak products to Cleer 600 A loadbreak bushings Failure to comply could lead to a fault that may result in death or serious injury WARNING High Voltage Do not close or...

Страница 10: ...gs with a fast firm straight motion Minimum amount of travel of connector to break load is 9 230 mm Using the clampstick move the connector away from the bushings and place the metallic portion of one...

Страница 11: ...source side loadbreak bushing See Figure 13 Figure 12 Remove C LCN connector LOAD SOURCE REMOVE LCN BOL T TERMINATION T OP II OR BT TAP TERMINATION Figure 13 Install 600 A loadbreak protective cap LOA...

Страница 12: ...and obtain good footing Slam the elbow onto the bushing with one quick and continuous motion Figure 14 Remove 200 A loadbreak protective cap SOURCE 200 A LOADBREAK REDUCING TAP PLUG LOAD 200 A LOADBR...

Страница 13: ...last operation push on the clampstick to seat the elbow all the way onto the bushing again This insures that the elbow is latched and was not dislodged during the latch ing check in previous step abo...

Страница 14: ...st firm straight motion Minimum amount of travel of connector to break load is 9 230 mm See Figure 18 Using the clampstick move the connector away from the bushings and place the metallic portion of o...

Страница 15: ...gh the load side 600 A loadbreak bushing interface to verify circuit is de energized See Figure 20 Step 6 Install grounding elbow If circuit is de energized install Cleer 600 A 15 25 kV grounding elbo...

Страница 16: ...7 25 6 649 5 00 127 4 00 101 6 8 93 226 8 2 04 51 8 26 88 682 8 CONFIGURATION 1 CONFIGURATION 2 CONFIGURATION 3 Figure 22 In line mounting configurations and dimensions Mounting configurations and dim...

Страница 17: ...5 mm 4 00 101 6 mm 3 55 90 2 mm 5 0 127 3 0 76 10 5 264 11 5 292 3 55 90 2 7 90 200 7 15 30 388 6 4 0 101 6 12 79 324 9 10 21 259 3 7 0 178 3 5 89 1 5 38 12 0 8 20 mm 2 0 51 mm 7 0 178 mm 7 0 178 mm 1...

Страница 18: ...This page intentionally left blank 14 CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS MN650019EN March 2016...

Страница 19: ...This page intentionally left blank 15 CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS MN650019EN March 2016...

Страница 20: ...ates Eaton com cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No MN650019EN Rev 00 Replaces S6001001 Rev 04 Eaton is a registered trademark All trademarks are property of...

Отзывы: