background image

INSTALLATION
MANUAL

HUBER+SUHNER AG

Fiber Optics

M

ASTER

L

INE

U

ltimate

 S

mall

 C

ell

DOC-0000803869
November 24, 2017

Page 1 of 4

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and

accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by

HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the gen-

eral handling of these products please contact HUBER+SUHNER.

MASTERLINE Ultimate Small Cell

Table of contents

GENERAL  INFORMATION .......................................................................................... 1

NOTES IN THIS MANUAL ........................................................................................... 1

NOTES ON THE FULFILMENT OF LEGAL CRITERIA .............................................. 1

INSTALLATION ............................................................................................................ 2

GENERAL INFORMATION

Read the cable system user manual and installation manual carefully. General safety instructions apply unless this docu-
ment stipulates more specific instructions. HUBER+SUHNER declines all liability and claims if the specifications are not
met.

NOTES IN THIS MANUAL

The following symbols are used in this manual.

Info notes:
Info notes contain important instructions for installation and proper use of the product throughout its life
cycle. The info notes also indicate that non-compliance may result in material damage or financial loss.

Notes about hazards and safety precautions:

Notes which indicate that non-compliance may result in danger to life and limb, as well as to  material
damage. It is imperative that these notes are heeded.

NOTES ON THE FULFILMENT OF LEGAL CRITERIA

The installation of optical communications systems requires that requisite permits be obtained from all the competent au-
thorities. The installation technician is responsible for compliance with all applicable regulatory restrictions, usage regula-
tions and other guidelines. This applies to permanent and temporary installations.

 

Ascertain the applicable restrictions and usage regulations prior to installation.

 

Draw up a cable-laying plan prior to installation.

 

Check the finished system for compliance with usage and safety regulations.

Содержание MASTERLINE Ultimate Small Cell

Страница 1: ...HUBER SUHNER declines all liability and claims if the specifications are not met NOTES IN THIS MANUAL The following symbols are used in this manual Info notes Info notes contain important instructions for installation and proper use of the product throughout its life cycle The info notes also indicate that non compliance may result in material damage or financial loss Notes about hazards and safet...

Страница 2: ...please contact HUBER SUHNER INSTALLATION Step 1 Slinging points The Masterline Ultimate Small Cell may only be lifted up at the slinging points marked in red Avoid buckling the cable or bending it at less than the minimum radius while the device is being raised All plug type cables must be unplugged prior to raising Step 2 Fixing Mast mounting The Small Cell may only be fixed to a flat base by the...

Страница 3: ...LU SC A1 and MLU SC H1 must be secured within 1 meter by means of a suitable cable clamp The offset between the first cable clamp and the cable entry must be kept to a minimum The cable must be fastened at regular inter vals of not more than 1 meter using a suitable cable clamp Step 4 In the case of a daisy chain installation all the Small Cell housings must be fastened in ac cordance with steps 1...

Страница 4: ...to check that the connector is properly engaged Please refer to the general instructions in the user manual for guidance on handling cables and laying multi connector cables Step 7 All jumper cables must be fastened at regular intervals of not more than 1 meter using cable clamps Step 8 Once all the jumper cables have been con nected the main line can be connected to the base station or to the fib...

Отзывы: