
INSTALLATION MANUAL
MASTERLINE Ultimate Small Cell
Page 2 of 4
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the gen-
eral handling of these products please contact HUBER+SUHNER.
INSTALLATION
Step 1:
Slinging points:
The Masterline Ultimate Small Cell may only
be lifted up at the slinging points marked in
red.
Avoid buckling the cable or bending it at less
than the minimum radius while the device is
being raised.
All plug-type cables must be unplugged prior
to raising.
Step 2:
Fixing:
Mast mounting:
The Small Cell may only be fixed to a flat base
by the fixing lugs marked. The fixing tech-
nique must be adapted to suit the base.
Please heed the instructions given by the
manufacturer of the fixing materials.
Mast mounting:
Always use two hose clamps to fix the Small
Cell to a mast. Guide the hose clamps at the
bottom into the lugs provided and then secure
them to the mast.