Instruction manual CCS 5, 15/ 10/ 2021
9
2.3. Connection to the hydraulic or lubricating system
•
The CCS 5 can be handled in a
suction
as well as in a
pressure
operating mode
.
Only ONE inlet hose is allowed to be connected at the same time, either
PRESSURE
INLET
OR
SUCTION INLET
.
Connection for suction mode
connection for pressure mode
•
Connections from the top to the bottom:
OUTLET
port,
pressure INLET
port and
SUCTION INLET
port for the return line.
Use only the labeled hoses, that supplied by Eaton with the CCS 5.
Check the hoses before using.
Also check the cleanliness of the ports at the CCS 5, the hydraulic system and the
hoses.
The ports must be cleaned before using.
2.3.1.
Connection into the pressure operating mode (max. 350 bar)
•
Connect the return hose (transparent plastic hose) with the
[OUTLET PORT]
of the CCS
5 and transfer it to an oil collecting tank.
➢
The oil collecting tank must be dimensioned according to the time needed to
perform the operation. Otherwise you must provide an empty replacement tank
that may be quickly changed when the first one is full.
➢
You may also circulate the measured oil back to the tank of the system.
➢
Never connect the recirculation to a pressurized line!
•
In the
pressure operating mode
the provided high pressure hose (minimess hose) is
being connected with the CCS 5 -
[PRESSURE PORT]
and the hydraulic system.