DPD-9E2305
21
1.
2.
3.
③
Disconnect the internal battery connector.
④
Unscrew and remove the 2 screws of the metal battery
cover.
⑤
Remove the battery cover to free the battery pack.
⑥
Pull out the plastic handle of the battery pack and
slide the pack out slowly on to a flat and stable surface.
Use two hands to support the battery pack. See
"Recycling the used equipment" section
for proper
disposal.
Verify that the replacement batteries have the same
rating as the batteries being replaced. Put the new
battery pack into the UPS. Push the battery pack firmly
to ensure a proper connection.
Reassemble in the reverse order, finally follow
instructions
“Testing new batteries” below.
Testing new batteries :
To test new batteries:
Charge the batteries for 48 hours.
Press any button to activate the menu options.
Select Control then Start battery test. The UPS starts a battery test if the batteries are fully charged, the UPS is in
Normal mode with no active alarms, and the bypass voltage is acceptable. During the battery test, the UPS transfers
to Battery mode and discharges the batteries for 10 seconds. The front panel displays "Battery test in progress" and
the percentage of the test completed.
7.5 Recycling the used equipment
Contact your local recycling or hazardous waste center for information on proper disposal of the used equipment.
eaton.com/recycling