Eaton 93PM-L 20 – 60 kW (208V) UPS Installation and Operation Manual P-164000711—Rev 03
51
33..66
IInnssppeeccttiinngg aanndd U
Unnppaacckkiinngg tthhee U
UP
PS
S C
Caabbiinneett
The cabinet is shipped bolted to a metal and wood pallet (see
,
, or
) with outer
protective packaging material covering the cabinets.
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on the product's resources page
become void. See
for details. This service is offered as part of the
sales contract for the UPS. Contact an Eaton service representative in advance (a
minimum two-week notice is required) to reserve a preferred startup date.
WARNING
The UPS cabinet is heavy (see
,
or
). If unpacking and unloading instructions are not
closely followed, the cabinet may tip and cause serious injury or death.
1.
Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION
Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative
immediately.
NOTE
For the following step, verify that the forklift or pallet jack is rated to handle the weight
of the cabinet (see
or
for cabinet weight).
2.
Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible,
before unpacking. If possible, move the cabinet using the pallet. Insert the forklift or pallet jack forks
between the supports on the bottom of the pallet (see
, or
and their
corresponding Center of Gravity tables for the UPS cabinet center of gravity measurements).
CAUTION
Do not tilt the UPS cabinet more than 10° from vertical or the cabinet may tip over.
3.
Set the pallet on a firm, level surface, allowing a minimum clearance of 3m (10 ft) on each side for
removing the cabinet from the pallet.
4.
Remove the protective packaging material from the cabinet and recycle in a responsible manner. Retain
any parts kits packaged with the cabinet.
5.
Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading.
If damage has occurred or shortages are evident, contact an Eaton service representative immediately to
determine the extent of the damage and its impact on further installation.
NOTE
While waiting for installation, protect the unpacked cabinet from moisture, dust, and
other harmful contaminants. Failure to store and protect the UPS properly may void the
warranty.
Содержание 93PM-L 60-1
Страница 1: ...p n P 164000711 Revision 03 20 60 kW 208V UPS Installation and Operation Manual Eaton 93PM L UPS ...
Страница 4: ......
Страница 12: ...xii Eaton 93PM L 20 60 kW 208V UPS Installation and Operation Manual P 164000711 Rev 03 List of Tables ...
Страница 22: ...10 Eaton 93PM L 20 60 kW 208V UPS Installation and Operation Manual P 164000711 Rev 03 Introduction ...
Страница 112: ...100 Eaton 93PM L 20 60 kW 208V UPS Installation and Operation Manual P 164000711 Rev 03 UPS System Installation ...
Страница 156: ...144 Eaton 93PM L 20 60 kW 208V UPS Installation and Operation Manual P 164000711 Rev 03 Communication ...
Страница 164: ...P 16400071103 P 164000711 03 ...