Integrated Accessory Cabinet-Distribution Operating Instructions
Eaton 93E Integrated Accessory Cabinet-Distribution (30IAC-D and 60IAC-D) Installation and Operation Manual P-164000072—Rev 2
www.eaton.com/powerquality
6-3
6.2
IAC-D Operation
To operate the IAC-D:
1.
Open the front door (see Figure 4-1) by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
2.
Verify that the IAC-D circuit breakers are set as follows:
3.
Start the UPS. Refer to the applicable Eaton 93E UPS Installation and Operation manual listed in
paragraph 1.7 for UPS operating procedures.
4.
Close the distribution panel input breaker.
5.
Close the distribution panel branch breakers
6.
Close the subfeed breakers (if installed).
7.
Close the door and secure the latch.
Distribution Panel Input Breaker
OPEN
Distribution Panel Branch Breakers
OPEN
Subfeed Breakers (if installed)
OPEN
Содержание 93E 30IAC-D
Страница 2: ......
Страница 19: ...Section 1 Installation ...
Страница 20: ......
Страница 59: ...Section 2 Operation ...
Страница 60: ......
Страница 75: ......
Страница 76: ... P 164000072 2 P 164000072 2 ...