Installation
4-22
Eaton 93E Integrated Accessory Cabinet-Distribution (30IAC-D and 60IAC-D) Installation and Operation Manual P-164000072—Rev 2
www.eaton.com/powerquality
Figure 4-18. Subfeed Output Terminal Location– 93E 30IAC-D and 93E 60IAC-D
4.5
Initial Startup
Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms specified on page W-1 become void. This service is offered as part of the sales contract for the
UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a
preferred startup date.
4.6
Completing the Installation Checklist
The final step in installing the IAC-D is completing the following Installation Checklist. This checklist ensures
that you have completely installed all hardware, cables, and other equipment. Complete all items listed on the
checklist to ensure a smooth installation. Make a copy of the Installation Checklist before filling it out, and retain
the original.
After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS
system and commission it to support the critical load. The service representative cannot perform any
installation tasks other than verifying software and operating setup parameters. Service personnel may request
a copy of the completed Installation Checklist to verify all applicable equipment installations have been
completed.
AC Output to
Critical Load
Phase A
Phase B
Phase C
NOTE
The Installation Checklist MUST be completed prior to starting the UPS system for
the first time.
Содержание 93E 30IAC-D
Страница 2: ......
Страница 19: ...Section 1 Installation ...
Страница 20: ......
Страница 59: ...Section 2 Operation ...
Страница 60: ......
Страница 75: ......
Страница 76: ... P 164000072 2 P 164000072 2 ...