UPS SYSTEM INSTALLATION
EATON
Powerware
®
9395 UPS (1000–1100 kVA) Installation and Operation Manual
S
164201764 Rev 1
www.powerware.com
4−32
Battery
Disconnect
TB1
Battery Aux
Battery Aux Common
48 Vdc Battery Shunt Trip +
48 Vdc Battery Shunt Trip –
UPS
ST
5
6
7
8
NOTE
Battery aux and DC shunt trip wiring should be a minimum of 18 AWG.
48 Vdc
Figure 4-26. Typical Battery Interface Connection – Common Battery System
UPM 1
Battery
Disconnect
TB1
UPS
ST
UPM 2
Battery
Disconnect
ST
UPM 4
Battery
Disconnect
ST
UPM 3
Battery
Disconnect
ST
48 Vdc
Battery Aux
Battery Aux Return
48 Vdc Battery Shunt Trip
+
48 Vdc Battery Shunt Trip
−
5
6
7
8
NOTE
Battery aux and DC shunt trip wiring should be a minimum of 18 AWG.
Figure 4-27. Typical Battery Interface Connection – Separate Battery System
Содержание 9395 UPS 10001100 kVA
Страница 104: ...EATON Powerware 9395 UPS 1000 1100 kVA Installation and Operation Manual S 164201764 Rev 1 www powerware com 5 20...
Страница 173: ......
Страница 174: ...1642017641 164201764 1...