ondary contacts when in the disconnected position. The
structure mounted secondary contact blocks are perma-
nently mounted and cannot be moved out for direct con-
nection with the breaker mounted secondary contacts.

b) For the behind the door configuration, carefully load
the breaker into the structure until it reaches the Test
position. For the flush mounted configuration, carefully
move the breaker toward the structure until it reaches
the Test position.

c) If a lifting yoke was used to move and/or load the
breaker, remove the yoke at this time.

d) For the behind the door configuration, manually
engage the secondary contact blocks by pulling the
movable blocks forward as far as possible. For the flush
mounted configuration, connect the test cable to both
the breaker and structure   secondary contact blocks. As
soon as control power is available, the motor  will
charge the closing springs.

e) Close and trip the breaker several times to verify the
closing and tripping operations

f) Conclude by closing the breaker.

4-9  BREAKER / COMPARTMENT INTERFACE CHECK

The assembly is provided with the following interlocks to
insure safe and correct operation:

a) Floor Tripping and Spring Release Interlock:
This optional interlock closes and trips the breaker if the
closing springs are charged as the breaker is moved
from the Test position to the Withdrawn position and
vice versa.

b) Levering Interlocks:
1.

Carriage Assembly Version: This version is used for
single tier switchgear configurations. The levering
crank can only be engaged when the breaker is
open and the shoot bolt lever is lifted (Figure 4-1b)
The breaker will not close manually or electrically
while the levering crank is engaged.

2.

Cradle Assembly Version: This version is used for
double tier switchgear configurations. The levering
crank can only be engaged when the breaker is
open and the horizontal shoot bolts are engaged
(fully extended). The breaker will not close manually
or electrically while the levering crank is engaged.

c) Anti-Close Interlock: This interlock prevents releasing
the closing springs electrically or manually if the breaker
is already closed.

d) Anti-Latch Interlock: This interlock prevents the
breaker from being closed between the Connected and
Test positions.

e) Shutter Drive Interlock:
The metallic switchgear shutters are independently
operated permitting them to be locked in the open posi-
tion for servicing the primary disconnects. The locking
system is disabled when the breaker is being connected
permitting the shutters to operate in the normal manner.

f) Earthing Drive Interlock:
If the switchgear is equipped with an earthing switch,
the breaker can only be inserted into the switchgear if
the earthing switch is open.

Check for the correct operation of the interlocks just
described by starting with the breaker in the Test posi-
tion and completing the following steps:

Step 1: Engagement of Levering Crank:
1.  For the single tier configuration carriage assembly

version, the shoot bolt should be fitted into the first
slot of the interlock plate located on the floor of the
switchgear. Charge the closing springs and close
the breaker. The slider cannot be pushed far
enough to engage the levering crank.

2.  For the double tier configuration cradle assembly

version, the horizontal shoot bolts should be fitted
into the slots of interlock plates located at the sides
of the switchgear. Charge the closing springs and
close the breaker. The slider cannot be pushed far
enough to engage the levering crank.

Step 2 :
Open the breaker, engage the levering crank and lever
the breaker into the Connected position. Remove the
levering crank.

Step 3:
Close the breaker. The motor starts charging the closing
springs if control power is available.

Step 4: 
Open the breaker, engage the levering crank and
attempt to close the breaker manually or electrically.
The breaker will go trip free (spring discharge but break-
er does not close).

Step 5: 
Lever the breaker out approximately half way towards
the Test position. Remove the levering crank and
attempt to close the breaker by pushing the manual
close button. The breaker will go trip free. Lever the
breaker all the way into the Test position. The sec-
ondary disconnects will disengage automatically.

Содержание 36W-VAC25

Страница 1: ...1993 Cutler Hammer Instructions for Installation Operation and Maintenance of Type W VAC Vacuum Circuit Breakers W VAC Breaker Element W VAC Breaker with Carriage Assembly for SIngle Tier Switchgear W...

Страница 2: ......

Страница 3: ...LD BE ATTEMPTED ONLY BY QUALIFIED PERSONNEL THIS INSTRUCTION BOOK SHOULD NOT BE CON SIDERED ALL INCLUSIVE REGARDING INSTALLA TION OR MAINTENANCE PROCEDURES IF FUR THER INFORMATION IS REQUIRED YOU SHOU...

Страница 4: ...t Interface Check 13 SECTION 5 DESCRIPTION AND OPERATION 5 1 Interrupter Assembly 16 5 1 1 Vacuum Interrupter 16 5 1 2 Contact Erosion Indicator 17 5 1 3 T Cutout Loading Spring Indicator 17 5 1 4 Con...

Страница 5: ...Warning 25 6 2 Frequency 25 6 3 Inspection and Maintenance Procedures 26 6 4 Vacuum Interrupter Integrity Test 27 6 5 Contact Erosion and Wipe 27 6 6 Insulation 28 6 7 Insulation Integrity Check 28 6...

Страница 6: ...reaker Manual Operation Single Tier Breaker Shown 13 5 1 Flush Mounted Configuration 16 5 2 Behind the Door Configuration 17 5 3 Closeup of Type W VAC Breaker Vacuum Interrupters and Current Carrying...

Страница 7: ...W VAC BREAKERS ARE PROTECTIVE DEVICES AS SUCH THEY ARE MAXIMUM RATED DEVICES THEREFORE THEY SHOULD NOT UNDER ANY CIRCUMSTANCES BE APPLIED OUT SIDE THEIR NAMEPLATE RATINGS WARNING Table 1 1 Type W VAC...

Страница 8: ...he hf 3L h3Le he hf S hS L h W he Y h Y J h U he hf H h V he hf he N he hf 3 hf J he W he V4 L h U he hf N h V he3L hf H h S hf J he W he Y L h U hf N h V he hf H h hf L h X he X hf J h N1 heV H h N...

Страница 9: ...V M 5 7 V H e hf 3L e N V h Xg X h X X h V h V e N1 hS N1 h L Lh7H h X f31 X T5 Xe Xe J5 Xe X h he X e e e e fS5 V Y V eV g U hf e f g f V f V hJ 1 h N1 h H f Y V h7 h J h h 3L f hf h Lhe S J h3 V h 7...

Страница 10: ...not work on a breaker with the secondary test cou pler engaged Failure to disconnect the test coupler could result in an electrical shock leading to death per sonal injury or property damage Do not wo...

Страница 11: ...for any signs of damage or rough handing Open the con tainer carefully to avoid any damage to the contents When opening the container be careful that any loose items or hardware are not discarded with...

Страница 12: ...cks should be made to make sure that the breaker is free from shipping dam age and is in satisfactory operating condition The breaker is shipped with its contacts open and clos ing springs discharged...

Страница 13: ...97 Figure 3 2 Type W VAC breaker element faceplate 1 2 3 8 7 4 5 6 Front Panel Manual Charge Socket Open Closed Indicator Spring Charged Discharged Indicator Operation Counter Rating Nameplate Manual...

Страница 14: ...1 2 3 4 5 L H Closing Spring Anti pump Relay Auxiliary Switch Motor Cutoff Switch Closing Cam Spring Release Close Coil Assembly Shunt Trip Assembly Position Switch Charging Motor Charging Pawl Ratch...

Страница 15: ...4 Rear external view of W VAC breaker element 1 Secondary Disconnect Lifter Yoke Opening Support Insulator Primary Disconnect Vacuum Interrupter Contact Loading Spring Wipe Spring Operating Rod Drive...

Страница 16: ...view W VAC breaker with carriage assembly for single tier switchgear Side View Rear View Mechanism Enclosure Support Insulator Primary Disconnect Levering in Screw Carriage Carriage Wheel Shoot Bolt...

Страница 17: ...VAC breaker with cradle assembly for double tier switchgear Front View Rear View Mechanism Enclosure Support Insulator Primary Disconnect Levering in Screw Cradle Cradle Wheel Shutter Operator Leveri...

Страница 18: ...TACT EROSION AND WIPE Manually charge the closing springs and close the breaker Check contact erosion and wipe as described in Section 6 5 4 6 PRIMARY CIRCUIT RESISTANCE Check the primary circuit resi...

Страница 19: ...Type W VAC breaker manual operation single tier breaker shown a Inserting the maintenance tool into the manual charging socket b Lifting shoot lever permits insertion of levering crank c Manually clos...

Страница 20: ...Anti Close Interlock This interlock prevents releasing the closing springs electrically or manually if the breaker is already closed d Anti Latch Interlock This interlock prevents the breaker from bei...

Страница 21: ...sembly version lift the shoot bolt lever and pull the breaker out The breaker will close and trip as it comes out from the Test position 2 For the double tier configuration cradle assembly version ret...

Страница 22: ...is racked into the fully connected position Possibility 3 The basic breaker element combined with a cradle assembly is used for double tier switchgear This combination is only for use in a behind the...

Страница 23: ...is located on the moving stem of the interrupter Figures 6 2 and 6 3 In order to determine if the contacts have eroded to the extent that the interrupter must be replaced close the breaker and observ...

Страница 24: ...ed to the support molding resulting in the support molding being enclosed on all four vertical sides Figure 5 4 5 2 STORED ENERGY MECHANISM KEEP HANDS AND FINGERS AWAY FROM THE BREAKER S INTERNAL PART...

Страница 25: ...gh the main link to close the breaker In Figure 5 5c the linkage is shown with the breaker in the closed position before the closing springs have been recharged Interference of the trip D shaft with t...

Страница 26: ...T XV X W T h V XV T R Ug N L N R XV U N1g W 3L X V S X Y V I 3 eW R h eV4 UeW g W XfV 7H 0R T T KS5 g 0R R40Y e 6T e W eI Y O g W Yh 0Y 7H hfV L g 3L f Kh V X S 3 O e eV X f he Y e V40Y h3Le S e f e h...

Страница 27: ...e V h g f e e V e e g hf f e e e e f W hf e f Y e e f J5 W2 Y h Xe f fW2 e U heV Me V e hf f g f W g W hO U he f Y f 0Y V g T e f f e eV U O K W V g 0R4 e f Y J5 Y X X V X e f f g J LV f X S Xh e e T...

Страница 28: ...nted male plugs To disengage the sec ondary plugs from the TEST position simply push the carriage to the rear 5 3 3 UNDERVOLTAGE TRIP DEVICE The undervoltage trip device for W VAC breakers is an elect...

Страница 29: ...d by the breaker operating shaft prevents the levering crank from being inserted with the breaker in the Closed position 5 4 3 ANTI CLOSE INTERLOCK This interlock prevents releasing the closing spring...

Страница 30: ...6Xg gW 6K f e W 1 6K f gW2 6Kg g O2 6X W2 6Kg f W2 X W26Kg Lg O2 6X gO2 6X N N X W 6K H 3 X J L W2 5 W2 6X 7 W2 W26X 3 K e f O 5 X f f W H 6X eJ eW 5 6X e Lf O f f O2 1 7 6Xf fW 1 7 6XfJ 1f W2 1 W2 6X...

Страница 31: ...he g V he 3T5 f Y eS 0 Me Hhe X 3T Xh N H g W 7UfV U O he h V e W V X g g U V U he U N R g 3L g N1 S he h X e V h N1 g U he g S g g S1 he Y e W g he h 7H g f 3Lhe g f h 3L hf eV he h 3L X V hf 3T X he...

Страница 32: ...7H 7 L heS5 75 7H V f 3 h X he f N1 e R4 g S S g He hV g O he X f gV g 7H e 5 X e S S g g L e V X U he fO2 f X V h 3L 3Lg he Ke X f e e7He U g W e f h U he S f h f e V Xe 7H 7 heW e 31 1 Le N1 heN1 31...

Страница 33: ...free cloth Primary Disconnects No burning or damage Visual Check Replace if burned damaged or eroded 3 Control Closing and Tripping Device Smooth and correct Test closing and tripping Replace any defe...

Страница 34: ...uld have sufficient volt ampere capacity It is recommended that the equipment be capable of delivering 25 milliamperes for one minute Although an ac high potential test is recommended a dc test may be...

Страница 35: ...55812CA or commercial equivalent Secondary control wiring requires inspection for tightness of all connections and damage to insulation 6 7 INSULATION INTEGRITY CHECK Primary Circuit The integrity of...

Страница 36: ...c These bearings are packed at the factory with a top grade slow oxidizing grease which normally should be effective for many years They should not be disturbed unless there is definite evidence of sl...

Страница 37: ...ood grease solvent Don not use carbon tetracholride They should then be washed in light machine oil until the cleaner is removed After the oil has been drawn off the bearings should be packed with Cut...

Страница 38: ...itch off Secondary Disconnects Motor Cut off Switch Poor or burned contacts Lever not operational Terminals and connectors Poor or burned contacts Motor Brushes worn or commutator segment open Mechani...

Страница 39: ...ch or trip bar not reset Auxiliary Switch b contact open or burned Motor Cut off Contacts open or burned Trip Coil Assembly Clapper fails to reset Pole Shaft Not open fully Trip Latch Reset Spring Dam...

Страница 40: ...en Terminals and Connections Poor or burned or open Trip Mechanism Trip Clapper Jammed Trip Bar Trip Latch Jammed Trip Sound Trip Mechanism Pole Shaft Jammed Operating Rod Assembly Broken or pins out...

Страница 41: ...and con tinuity requirements Each customer should develop his own stock level based on operating experience Refer to Table 7 1 for guidance 7 2 ORDERING INSTRUCTIONS a Always specify the breaker rati...

Страница 42: ...W M I MI Y hg Y X hf h 31 hf g V hf 3 6T KO2 W26Xhe S 40R4 U 0R X h 6T T W Yf B 9e h X S U 7U T K C MB hf V4 0R R N U H f g U S 6T T2 h J R MI R R he Y V Yh g h hf h hf h hf h hf h hf h h h e f h M h...

Страница 43: ...125 VAC Cap trip 3759A76G02 1 220 250 VDC 220 250 VAC Cap trip 3759A76G03 1 15 UV Trip Coils 48 VDC 8067A19G01 1 110 125 VDC 8067A19G02 1 220 250 VDC 8067A19G03 1 16 Motor Cut Off Switch 5677B02G01 1...

Страница 44: ...ard 691C662G01 1 UV 691C666G01 1 21 Trip Latch Hatchet 699B040G01 1 22 Cluster Assembly 630A 699B104G01 1 800 1250A 508B022G01 1 1600 2000A 5677B328G01 1 23 Shock Absorber 5677B26H01 1 W f hf e h 6K W...

Страница 45: ...I B 3A74499B Page 39 Effective 11 97...

Страница 46: ...I B 3A74499B Page 40 Effective 11 97...

Страница 47: ...I B 3A74499B Page 41 Effective 11 97...

Страница 48: ...e contract between the purchaser and Cutler Hammer NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PAR TICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARISING FROM COURSE OF...

Отзывы: