38
Form E-551
Replacing of Take-off Conveyor Drive Belt
Removing the Take-off Conveyor Drive Belt
1.
Power down the machine using the proper lock out / tag lock out procedures.
2.
Remove the (3) allen screws which secure the cover to the assembly on the operator side.
3.
Carefully remove the cover without disturbing the electronics connection.
Содержание MPC 5000
Страница 25: ...25 FormE 551 8 Remove the screws found on the non operator side of Y pulley plate 9 Remove the pulley plate ...
Страница 56: ...56 FormE 551 Lubrication Chart Below are the lubrication points for the Multi Ply Cutter ...
Страница 65: ...65 FormE 551 Additional Comments Maintenance Signature Date ...