24 Operation
Shutting Down
When shutting down it is important to let the temperature inside the shrink tunnel cool
down before turning off the main power.
Turn the Heater switch to the “OFF” position.
Attention!
Do not turn the conveyor and blower off until the shrink
tunnel has cooled down considerably.
After the temperature in the tunnel has cooled (this will be a considerable
amount of time) turn the Conveyor and Blower off.
Turn “Main Power” switch to the “OFF” position.
Содержание L-Bar Sealer Tunnel Combo Unit Value Series
Страница 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Страница 2: ......
Страница 4: ......
Страница 7: ......
Страница 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Страница 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Страница 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Страница 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Страница 50: ...50 Parts List L SealerAndFrame VS1620E ...
Страница 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Страница 61: ......
Страница 62: ......