Installation and Set Up 15
The film position is adjustable. Loosen the film core retaining collar lock knobs and
position the shrink film roll according to the product size. Retighten the retaining
collar locking knobs.
The pin perforation wheel punches little holes in the shrink wrap to allow air to evacuate
while in the shrink tunnel. Loosen the pin perforation adjustment knobs at each end of
the perforating wheel roller and move the perforation rollers away from the rubber roller.
Position the pin perforation rollers according to the product size. After threading the film
move the perforating wheels back to the operating position (against the rubber roller)
and retighten the pin perforation adjustment knobs.
The product tray position is adjustable. Loosen the product tray adjustment knob and
align the product tray with the center fold edge of the shrink film. Retighten the
adjustment knob.
Film Core
Thumb Screw
Locking Knobs
Pinwheel
Perforation
Rollers
Shrink Film
Roller
Product Tray
Adjustment Knob
Pin
Perforation
Adjustment
Knob
Pin
Perforation
Adjustment
Knob
Содержание L-Bar Sealer Tunnel Combo Unit Value Series
Страница 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Страница 2: ......
Страница 4: ......
Страница 7: ......
Страница 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Страница 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Страница 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Страница 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Страница 50: ...50 Parts List L SealerAndFrame VS1620E ...
Страница 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Страница 61: ......
Страница 62: ......