20 Operation
Conveyor and Blower
Press the Conveyor and Blower “ON” (green button) to start the conveyor
and blower in the heat tunnel.
To turn the conveyor and blower off press the red Conveyor and Blower
“OFF” button.
Tunnel Heater
Turn the tunnel Heater Switch to the “ON” position.
Setting the Tunnel Temperature
Use the programmable switch to set the temperature
inside the shrink tunnel. The programmable switch will
display the current temperature inside the heat tunnel
(top) and the temperature setting.
Press the “SET” button to set the temperature.
Press this button to select the digit to change.
The selected digit will begin to flash.
Press the Up or Down arrows to change
the value of the selected digit.
Press the “SET” button to save the new values.
Attention!
Do Not
set the temperature higher than 350°. Setting the
temperature higher than 350° will damage the machine and the
product.
The output light will turn on while the tunnel is heating up.
Содержание L-Bar Sealer Tunnel Combo Unit Value Series
Страница 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Страница 2: ......
Страница 4: ......
Страница 7: ......
Страница 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Страница 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Страница 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Страница 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Страница 50: ...50 Parts List L SealerAndFrame VS1620E ...
Страница 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Страница 61: ......
Страница 62: ......