Installation and Set Up 17
Aligning the Shrink Tunnel
When the film, product tray and product are correctly aligned, release the red lever
stopper and position the entire sealer and product tray assemblies in line with the shrink
tunnel opening centering the product down the center of the tunnel. Reset the red lever
stopper to lock the sealer assembly in position.
Red Lever
Stopper
Shrink
Tunnel
Opening
Sealer and
Product Tray
Assemblies
Содержание L-Bar Sealer Tunnel Combo Unit Value Series
Страница 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Страница 2: ......
Страница 4: ......
Страница 7: ......
Страница 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Страница 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Страница 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Страница 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Страница 50: ...50 Parts List L SealerAndFrame VS1620E ...
Страница 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Страница 61: ......
Страница 62: ......