10
1.
Strip the individual wires by 12 mm. If the cable has
flexible conductors, it is recommended to use ferrules
on stranded wires. Use correct tools to press them.
2.
Tighten the screws with a torque of 5 Nm.
NOTICE!
Pull each wire to double check that they are
connected properly.
NOTICE!
When connecting multiple backplates in
parallel, each terminal serves as a coupling point for
adjacent backplates. All backplates must be connected
with the same phase sequence. External junction boxes
or flat cables can be used if it is more convenient.
Backplate
Wiring
4
TN/TT 3-phase (230/400 V)
PE
N
L1
L2
L3
TN 1-phase (230 V)
PE
N
L1
–
–
PE
1
2
Содержание Ready
Страница 1: ...Easee Ready User installation guide...
Страница 17: ...17...
Страница 18: ...18 Easee AS Grenseveien 19 4313 Sandnes Norway easee com...