Earthcore Industries
Isokern Maximus Linear Series Open Front Gas Fireplace
12/2021
54
Gas Line & Valve Box Installation
This appliance must be connected to the gas line in accordance with local codes and/or the National Fuel Gas Code, ANSI Z223.1.
After connecting the gas line, all joints in the line and connections at the valve should be checked for leaks before final
positioning of the unit. Conduct a gas leakage test of the appliance piping and control system downstream of the shutoff valve in
the supply line to the appliance.
1)
The valve control box comes with an 84” pilot assembly lead; therefore, the box must be mounted within 5’ of the fireplace for
models ISF36/60LB and within 1’ for models ISF72/96LB.
(Figure 55)
2)
Attach the metal enclosure to the studs using standard building materials. The metal enclosure must be mounted in a location
that can be accessed in the future for additional connections & future servicing.
3)
Installation and servicing of gas appliances and ignition systems must only be performed by qualified personnel.
4)
Turn off gas and electricity before starting installation or service.
5)
Make sure gas piping is pressure tested before control is connected. High pressure can damage the control causing a hazardous
condition.
6)
Make sure piping is clean and free from burrs. Apply a small amount of good quality gas-rated pipe thread compound or
plumbers’ tape suitable for the gas being used. Thread compound should be used sparingly on male threads only, leaving the
first two threads clean.
7)
It is recommended that a safety shut off valve is installed on either the gas in or gas outside of the valve.
8)
It is recommended to hard pipe in the connections with unions installed inside the box.
9)
Uncoil the pilot assembly. Be careful to not create unwanted kinks in the pilot tubing.
10)
Feed the spade connector ends of the pilot assembly from inside the fireplace to the outside being careful not to clog the flared
fitting of the pilot tube or damage the spade connectors.
11)
Plug the spade connectors into the module according to the below wiring diagram
(Figures 56 & 57)
, insert the pilot tubing into
the right side of the valve and, using a wrench, tighten the nut so that the pilot tubing cannot be pulled out.
2
FIGURE 55
Содержание Isokern MAXIMUS 82L120
Страница 68: ...68 Registration Card...