![background image](http://html1.mh-extra.com/html/eagle-group/q-lever-unit-with-all-wire-shelving/q-lever-unit-with-all-wire-shelving_assembly-instructions-manual_3298693006.webp)
6
See next page for Add-On Units
ASSEMBLY INSTRUCTIONS
Q-LEVER Cantilever Shelving
Step 8 - Tighten all hardware.
• Tighten all six leg-to-upright bolts
(figure 8a
),
six rear bolts of braces and X-brace
(figure 8b
),
and the nut & bolt at middle of X-brace
(figure 8b
)
until snug.
Don’t forget…
Install warning labels in visible location.
(End)
figure 8a
figure 8b
• Place the shelf onto pair of brackets,
lowering the corner collars of shelf
onto the four bracket tabs.
Step 7 - Install shelf.
bracket
tabs
corner
collars
shelf collars and
bracket tabs
Repeat Steps 6 & 7 to install the
remaining brackets and shelves.
Same hardware is used on units
with bottom dunnage shelf…
…or with bottom wire shelf