Figure 4

TYPICAL SUPPLY CABLE CONFIGURATION

and does not require the use of 

additional sealant or adhesive. 

4. INLET PIPE 

INSTALLATION:

 Mark the 

inlet pipe 3.5” from the end to 

be inserted. Inlet pipe leading 

edge should be beveled with 

a grinder and lubricated with 

a soap solution. Lubricate 

the inlet grommet with soap 

solution as well. Insert the pipe 

into the grommet up to the 3.5” 

mark. Inspect to ensure the 

grommet has remained intact 

and in place (Figure 7).

5. DISCHARGE:

 The use 

of 1.25” PVC pressure pipe 

SCH 40 and polyethylene 

pipe SDR 11 or SIDR 7 are 

recommended. If polyethylene 

is chosen, use compression-

type fittings to provide a 

smooth inner passage. 

E/One requires that an  

 

E/One Uni-Lateral assembly 

(E/One part number 

NB0184PXX or NC0193GXX) 

or E/One Redundant Check 

Valve (E/One part number 

PC0051GXX) be installed in 

the pipe lateral outside the 

home between the pump 

discharge and the street main 

on all installations. Never use 

a ball-type valve as a check 

valve. E/One recommends 

the valve be installed as close 

to the public right-of-way as 

possible. Check local codes for 

applicable requirements.

CAUTION:

 

Redundant check 

valves on station laterals 

and anti-siphon/check valve 

assemblies on grinder pump 

cores should not be used as 

system isolation valves during 

line tests.

 

There is a slide face valve(s) 

and a quick disconnect(s) 

pre-installed in the tank for 

each grinder pump connection. 

There is a stainless steel 

1.25” NPT female discharge 

connection(s) on the outside of 

the tank to support discharge 

piping connection.

Note: Models 481 and 482 

will have single discharge pipe 

connection; models 483 and 

484 will have two discharge 

pipe connections 180 degrees 

apart (standard).

6. BACKFILL 

REQUIREMENTS:

 Proper 

backfill is essential to the 

long term reliability of any 

underground structure. 

Several methods of backfill are 

available to produce favorable 

results with different native soil 

conditions.

The recommended method 

of backfilling is to surround 

the unit to grade using Class 

I or Class II backfill material 

as defined in ASTM 2321. 

Class 1A and Class 1B are 

recommended where frost 

heave is a concern; Class 

1B is a better choice when 

the native soil is sand or if a 

high, fluctuating water table 

is expected. Class I, angular 

crushed stone, offers an added 

benefit in that it needs minimal 

compaction. Class II, naturally 

rounded stone, may require 

more compactive effort, or 

tamping, to achieve the proper 

density.

If the native soil condition 

consists of clean compactible 

soil, with less than 12% fines, 

free of ice, rocks, roots, and 

organic material, it may be 

an acceptable backfill. Such 

soil must be compacted in 

lifts not to exceed one foot to 

reach a final Proctor Density 

between 85% and 90%. Non-

compactible clays and silts are 

not

 suitable backfill for this 

or any underground structure 

such as inlet or discharge 

lines. If you are unsure of 

the consistency of the native 

soil, it is recommended that a 

geotechnical evaluation of the 

material be obtained before 

specifying backfill.

Another option is the use of 

Power at the station must not drop below 10% of nameplate 

voltage. Maximum Recommended Length:

120 Volt 60’ (min. voltage at pump — 108V)

240 Volt 150’ (min. voltage at pump — 216V)

Consult factory for longer lengths

Содержание Extreme Series

Страница 1: ...1 WH48 WR48 Series Simplex Duplex Triplex Quadplex Typical Installation Instructions Warranty Information 486 Gal Capacity Grinder Pump Station ...

Страница 2: ...4 DWV 4 5 OD Supplied by others 9a STUB OUT 4 X 5 long watertight stub out to be installed at time of burial unless the gravity serviceline is connected during installation Supplied by others 10 DISCHARGE FTG 1 1 4 Female NPT stainless steel 11 DISCHARGE LINE 1 1 4 Nominal pipe size Supplied by others 12 CONCRETE ANCHOR See Ballast Calculations for specific weight for your station height Supplied ...

Страница 3: ...3 FAILURE TO COMPLY WITH INSTALLATION INSTRUCTIONS WILL VOID WARRANTY Figure 1 ...

Страница 4: ... standard grommet for connecting the 4 DWV 4 50 outside dia incoming sewer drain Other inlet types and sizes are optional CAUTION 4 DR 35 pipe has a smaller diameter and won t create a watertight joint with the standard 4 SCH 40 inlet grommet Confirm that you have the correct inlet before continuing Do not drop roll or lay tank on its side This will damage the unit and void the warranty Excavate a...

Страница 5: ...ximately 1 to 2 of concrete onto the gravel bed and place the tank into the excavation Ensure the tank is properly positioned in the excavation to support inlet pipe Section 3 and discharge pipe Section 5 connections before pouring the concrete ballast The unit should be leveled and filled with water about 24 deep to prevent shifting while the remaining ballast is being poured The concrete should ...

Страница 6: ...l depth per national and local code requirements must be accounted for when determining the inlet location The supply cable path should be considered when selecting the inlet location see Section 8 A 5 diameter field penetration of the tank wall is required to support installation of the standard inlet grommet This penetration must not remove or interfere with any of the structural ribbing on the ...

Страница 7: ...rge piping connection Note Models 481 and 482 will have single discharge pipe connection models 483 and 484 will have two discharge pipe connections 180 degrees apart standard 6 BACKFILL REQUIREMENTS Proper backfill is essential to the long term reliability of any underground structure Several methods of backfill are available to produce favorable results with different native soil conditions The ...

Страница 8: ...40 amp breaker is required before a 120V duplex alarm panel 9 ELECTRICAL CONNECTION Pump to Panel Fig 4 The grinder pump station is provided with a cable for connection between the station and the alarm panel supply cable for each grinder pump The supply cable a six conductor tray cable meets NEC requirements for direct burial as long as a minimum of 24 burial depth is maintained Those portions of...

Страница 9: ...anel will also contain one simplex or two duplex circuit breakers to control grinder pump power The pump circuit breaker s are labeled PUMP in the alarm panel For each grinder pump in the station perform the following procedure to verify proper installation and operation a Make sure that the slide face discharge valve s is fully open for each pump connection This valve s must not be closed when th...

Страница 10: ...10 ...

Страница 11: ...act as guides while aligning the bolt pattern of the two flanges 5 Support the upper accessway section a few inches over the tank Align the aluminum cover locking hasp on the fiberglass accessway section with the stainless steel discharge connection on the polyethylene tank Figure 6b Once aligned lower the upper section onto the mating flange using the three bolts to guide it to the proper positio...

Страница 12: ...12 Figure 7 ALLOWABLE INLET LOCATIONS INLET INSTALLATION ...

Страница 13: ...13 Figure 8 Figure 9 Figure 10 Figure 11 ...

Страница 14: ...tation or move it on its side 2 No Ballast to be poured in place If the concrete anchor is to be poured while the station is in place lift the unit using 2 nylon straps wrapped under the tank flange to make a sling as shown below Keep station oriented vertically to avoid any damage 3 Precast Ballast Never lift a station that has a ballast attached by any means except the rebar The weight of the co...

Страница 15: ... soil Section I Used To Determine The Volume Of Concrete Note 4 0 ft assumed inside diameter of concrete ballast ring around tank s bottom flange Volume Height Area 83 ft π 5 6 ft 2 4 0 ft 2 4 83 ft 12 06 ft2 10 1 ft3 Section II Used To Determine The Volume Of Saturated Soil Note 4 3 ft assumed inside diameter of soil column around tank s maximum diameter Volume Height Area 7 6 ft 83 ft π 5 6 ft 2...

Страница 16: ...application Station Height in Station Volume cu ft Fnet Buoyant lbs Tank Weight lbs Fballast lbs Volume Concrete cu ft Weight Concrete in Air cu ft Min Diameter of Concrete Anchor in Min Thickness of Concrete Anchor in 75 71 6 4088 380 4706 10 1 1515 68 10 92 85 1 4873 440 5623 10 1 1515 68 10 98 90 1 5175 445 5980 10 1 1515 68 10 104 95 0 5478 450 6330 10 1 1515 68 10 110 99 9 5780 455 6687 10 1 ...

Страница 17: ...17 ...

Страница 18: ...18 Environment One Corporation 2773 Balltown Road Niskayuna New York 12309 1090 Voice 01 518 346 6161 Fax 518 346 6188 www eone com NA0251P01 Rev E 10 18 A Precision Castparts Company ...

Страница 19: ...l Sanitary napkins or tampons Cigarette butts Caution Kitchen garbage disposals do not keep grease oil out of the plumbing system In addition you must never introduce into any sewer Explosives Strong chemicals Lubricating oil and or grease Flammable material Gasoline Items introduced into the sewer system from your home can potentially impact the water environment Proper disposal of household wast...

Страница 20: ... provided the product is properly installed serviced and operated under normal conditions and according to manufacturer s instructions Repair or parts replacement required as a result of such defect will be made free of charge during this period upon return of the defective parts or equipment to the manufacturer or its nearest authorized service center Limited Warranty For E One Extreme D Series W...

Отзывы: