Lifting Instructions
FAILURE TO FOLLOW THESE INSTRUCTIONS COMPLETELY WILL VOID WARRANTY.
1. Transporting unit to
installation site:
Always lift a
unit from the bottom for the
purpose of transportation.
The station should be
received attached to a pallet
for this purpose.
Never roll a
station or move it on its side.
2. No Ballast (to be poured in
place):
If the concrete anchor is
to be poured while the station
is in place lift the unit using 2
nylon straps wrapped under
the tank flange to make a sling,
as shown below. Keep station
oriented vertically to avoid any
damage.
3. Precast Ballast:
Never
lift a station that has a ballast
attached by any means except
the rebar. The weight of the
concrete will damage the
station if you attempt to lift it
from any part of the station.
Содержание Extreme Series
Страница 3: ...3 FAILURE TO COMPLY WITH INSTALLATION INSTRUCTIONS WILL VOID WARRANTY Figure 1 ...
Страница 10: ...10 ...
Страница 12: ...12 Figure 7 ALLOWABLE INLET LOCATIONS INLET INSTALLATION ...
Страница 13: ...13 Figure 8 Figure 9 Figure 10 Figure 11 ...
Страница 17: ...17 ...