Powerbox F series User Manual
I
Content
3.1.1 Environmental requirements ............................................................................... 11
3.1.2 Tools and data ..................................................................................................... 11
3.1.3 Technical preparation .......................................................................................... 12
3.1.4 Open the box to have inspection ......................................................................... 12
3.1.5 Engineering coordination .................................................................................... 14
3.2.1 Floor installation .................................................................................................. 15
3.2.2 Mounted on the wall ........................................................................................... 16
3.2.3 Electrical installation ............................................................................................ 18
3.2.4 Battery module DIP switch definition and description ........................................ 22