Powerbox F series User Manual
17
1
.
Use the positioning cardboard provided
with the goods to draw the screw hole
positions on the wall, as shown in the
four holes on the left.
2
.
The cardboard must be perpendicular
to the ground while drawing the holes.
3
.
The bottom of the cardboard is about
300mm from the ground.
4.
According to the position of the
mark, 8 holes in diameter 10mm
and depth of more than 70mm are
hit on the wall with an electric drill,
which are used for fitting expansion
bolt M6.
5.
Fixing the expansion bolt M6 into the
bottom of the hole on the wall, and fix
the Support bracket and Battery bottom
bracket on the wall with M6 bolts,
twisting force keeps 6NM.
6.
Carry or hoist the battery box to the
installed Battery bottom bracket.
Fixing the Support bracket and the
upper part of the battery box with
M6 bolts, twisting force keeps 6NM.
Then fixing the Battery bottom
bracket and the bottom part of the
battery box with M6 bolts, twisting
force keeps 6NM.