Powerbox F series User Manual
13
In the process of unpacking, handle with care and protect the surface coating of the
object.
Open the package, the professional installation person should read the technical
documents, verify the list, according to the configuration table and packing list,
ensure objects are complete and intact. If the internal packaging is damaged, it must
be inspected and recorded in detail.
Packing list is as follows:
Battery×1
Battery bottom bracket ×1
Support bracket ×2
M6 bolt ×8
Fixing battery box with
battery bracket
Power cable ×2
connect battery with inverter
Communication cable
M6 3 sets of combined screws
x 1 (Already installed on the
system cabinet)
Ground wiring
Expansion screw ×8
Positioning cardboard×1