F 38
F PL
500/
20S.
G
B 38
-74
- 04.
07
Side boards
Sliding shoes
The side boards which slide over the
ground (1) should be checked every 50
hours to ensure that they are still proper-
ly attached.
There is one side board on either side of
the milling box.
The sliding shoes on the side boards are
in continuous sliding contact with the as-
phalt during milling operations, as a re-
s u l t o f w h i c h t h e y a r e s u b j e c t t o
increased levels of wear. Once the ma-
terial on these shoes becomes too thin,
the shoes have to be replaced.
Check the sliding shoes on both side
boards at regular intervals and replace if
required.
- Remove side board (1) A:
- Lower side board until it makes con-
tact with the ground.
- Unscrew stop plate (2).
- Disconnect the cable sensor (3) if fit-
ted.
- Remove the cables (4) used for rais-
ing and lowering the side board.
Eye bolts can be employed instead of
cables for restraining and raising the
side board after removal.
- Remove guide bolts (5).
- Cut the welded sliding shoes (6) off
the side board.
- Weld new sliding shoes firmly to the
side board.
Take all necessary safety precautions
during cutting and welding work!
Iso500_compl_short.wmf,Box1_PL500_V2.wmf,Seitenschild1_PL500_V2.wmf
5
3
4
1
6
2
Содержание PL 500/20 S
Страница 2: ...VALUE QUALITY THE ORIGINAL Your authorised Dynapac dealer SPARE PARTS...
Страница 10: ......
Страница 21: ...B 9 B PL500 20S GB 9 20 04 07 PL500_measure_side_short wmf PL500_measure_top_short wmf...
Страница 27: ...B 15 B PL500 20S GB 15 20 04 07 5 2 Identification points 8 10 2 2 9 3 7 6 4 2 12 1 2 5 25 11...
Страница 28: ...B 16 B PL500 20S GB 16 20 04 07 14 13 16 16 3 17 20 19 2 2 18 13 21 22 23 24 14...
Страница 32: ......
Страница 40: ......
Страница 44: ...D 4 D PL500 20S GB 4 116 04 07 Panel3_V2 bmp A 4 7 6 9 10 8 5...
Страница 46: ...D 6 D PL500 20S GB 6 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 48: ...D 8 D PL500 20S GB 8 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 50: ...D 10 D PL500 20S GB 10 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 52: ...D 12 D PL500 20S GB 12 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 54: ...D 14 D PL500 20S GB 14 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 56: ...D 16 D PL500 20S GB 16 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 66: ...D 26 D PL500 20S GB 26 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 68: ...D 28 D PL500 20S GB 28 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 70: ...D 30 D PL500 20S GB 30 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 92: ...D 52 D PL500 20S GB 52 116 04 07 5 Operating the MOBA matic Nivellcompl cdr A C B...
Страница 94: ...D 54 D PL500 20S GB 54 116 04 07 6 Operating the MOBA matic Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 96: ...D 56 D PL500 20S GB 56 116 04 07 Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 156: ...D 116 D PL500 20S GB 116 116 04 07 10 4 MOBA Matic error messages...
Страница 183: ...F 23 F PL500 20S GB 23 74 04 07 Box1_Pl500_V2 wmf Box5_PL500 wmf 8 2 3 4 5 A B C D E 7 9 1 6...
Страница 227: ...F 67 F PL500 20S GB 67 74 04 07 9 2 Hydraulic system Result name signature Comments about scope of work Occasion MH Date...
Страница 229: ...F 69 F PL500 20S GB 69 74 04 07 9 4 Milling section Result name signature Comments about scope of work Occasion MH Date...
Страница 230: ...F 70 F PL500 20S GB 70 74 04 07 9 5 Water system Result name signature Comments about scope of work Occasion MH Date...
Страница 232: ...F 72 F PL500 20S GB 72 74 04 07 9 7 Other equipment Result name signature Comments about scope of work Occasion MH Date...