C 6
C PL5
00/
20S.
G
B
6-
8 -
04.
07
6
Towing
Comply with all specifications and introduce all requisite safety measures required for
the towing of construction equipment.
$
The tractor vehicle must be such that it can still hold the machine when travelling
downhill.
Only use authorised towbars!
$
Do not disengage travel drive and release brake until the machine has been properly
secured to prevent accidental rolling away, or is already properly connected to the
towing vehicle.
The engine compartment of the machine
includes a hand pump which must be ac-
tivated in order to tow away the machine.
- First of all, unfasten the lock nut (1) on
the hand pump and tighten the thread-
ing dowel (2) as far as possible into
the pump.
Retighten the lock nut for safety.
- Now use the lever to activate the hand
pump (3) until enough pressure has
been developed and the brakes have
released.
The brakes will release themselves at a
pressure of approx. 30 bar.
The machine can now be carefully and slowly towed out of the construction site area.
$
Always only tow the shortest distance to the means of transport or the next parking
possibility.
After towing, unfasten the threading dowel (2) a few turns, then secure again using
the lock nut (1).
The brakes are now active again and the machine is protected against rolling away.
Handpumpe.tif
3
2
1
Содержание PL 500/20 S
Страница 2: ...VALUE QUALITY THE ORIGINAL Your authorised Dynapac dealer SPARE PARTS...
Страница 10: ......
Страница 21: ...B 9 B PL500 20S GB 9 20 04 07 PL500_measure_side_short wmf PL500_measure_top_short wmf...
Страница 27: ...B 15 B PL500 20S GB 15 20 04 07 5 2 Identification points 8 10 2 2 9 3 7 6 4 2 12 1 2 5 25 11...
Страница 28: ...B 16 B PL500 20S GB 16 20 04 07 14 13 16 16 3 17 20 19 2 2 18 13 21 22 23 24 14...
Страница 32: ......
Страница 40: ......
Страница 44: ...D 4 D PL500 20S GB 4 116 04 07 Panel3_V2 bmp A 4 7 6 9 10 8 5...
Страница 46: ...D 6 D PL500 20S GB 6 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 48: ...D 8 D PL500 20S GB 8 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 50: ...D 10 D PL500 20S GB 10 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 52: ...D 12 D PL500 20S GB 12 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 54: ...D 14 D PL500 20S GB 14 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 56: ...D 16 D PL500 20S GB 16 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 66: ...D 26 D PL500 20S GB 26 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 68: ...D 28 D PL500 20S GB 28 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 70: ...D 30 D PL500 20S GB 30 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 92: ...D 52 D PL500 20S GB 52 116 04 07 5 Operating the MOBA matic Nivellcompl cdr A C B...
Страница 94: ...D 54 D PL500 20S GB 54 116 04 07 6 Operating the MOBA matic Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 96: ...D 56 D PL500 20S GB 56 116 04 07 Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 156: ...D 116 D PL500 20S GB 116 116 04 07 10 4 MOBA Matic error messages...
Страница 183: ...F 23 F PL500 20S GB 23 74 04 07 Box1_Pl500_V2 wmf Box5_PL500 wmf 8 2 3 4 5 A B C D E 7 9 1 6...
Страница 227: ...F 67 F PL500 20S GB 67 74 04 07 9 2 Hydraulic system Result name signature Comments about scope of work Occasion MH Date...
Страница 229: ...F 69 F PL500 20S GB 69 74 04 07 9 4 Milling section Result name signature Comments about scope of work Occasion MH Date...
Страница 230: ...F 70 F PL500 20S GB 70 74 04 07 9 5 Water system Result name signature Comments about scope of work Occasion MH Date...
Страница 232: ...F 72 F PL500 20S GB 72 74 04 07 9 7 Other equipment Result name signature Comments about scope of work Occasion MH Date...