F 35
F PL
500/
20S.
G
B 35
-74
- 04.
07
Oil change
$
First oil change after 50 hours of run-
ning-in period, thereafter every 500
hours, but at least once a year.
$
Always perform oil changes with the oil
at operating temperature, immediately
after the gearbox comes to a standstill.
This ensures that suspended particles of
solid matter do not have time to settle
and form sediment.
Wear protective clothing when draining
hot oil. Health hazard caused by contact
with the skin.
- Park machine in horizontal position
- Remove the inspection screw (2).
- Remove the oil drainage screw (1) and collect draining oil.
- After all the oil has drained, properly screw the drainage screw (1) back in.
- Top up with fresh oil through the opened bore in the level checking screw until a
small amount of oil emerges from the bore.
- Properly reinstall the inspection screw (2).
Collect used oil in a suitable container and dispose of properly.
$
When filling with oil, ensure high standards of cleanliness are observed.
Gear1000.wmf
2
1
Содержание PL 500/20 S
Страница 2: ...VALUE QUALITY THE ORIGINAL Your authorised Dynapac dealer SPARE PARTS...
Страница 10: ......
Страница 21: ...B 9 B PL500 20S GB 9 20 04 07 PL500_measure_side_short wmf PL500_measure_top_short wmf...
Страница 27: ...B 15 B PL500 20S GB 15 20 04 07 5 2 Identification points 8 10 2 2 9 3 7 6 4 2 12 1 2 5 25 11...
Страница 28: ...B 16 B PL500 20S GB 16 20 04 07 14 13 16 16 3 17 20 19 2 2 18 13 21 22 23 24 14...
Страница 32: ......
Страница 40: ......
Страница 44: ...D 4 D PL500 20S GB 4 116 04 07 Panel3_V2 bmp A 4 7 6 9 10 8 5...
Страница 46: ...D 6 D PL500 20S GB 6 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 48: ...D 8 D PL500 20S GB 8 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 50: ...D 10 D PL500 20S GB 10 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 52: ...D 12 D PL500 20S GB 12 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 54: ...D 14 D PL500 20S GB 14 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 56: ...D 16 D PL500 20S GB 16 116 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 66: ...D 26 D PL500 20S GB 26 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 68: ...D 28 D PL500 20S GB 28 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 70: ...D 30 D PL500 20S GB 30 116 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 92: ...D 52 D PL500 20S GB 52 116 04 07 5 Operating the MOBA matic Nivellcompl cdr A C B...
Страница 94: ...D 54 D PL500 20S GB 54 116 04 07 6 Operating the MOBA matic Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 96: ...D 56 D PL500 20S GB 56 116 04 07 Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 156: ...D 116 D PL500 20S GB 116 116 04 07 10 4 MOBA Matic error messages...
Страница 183: ...F 23 F PL500 20S GB 23 74 04 07 Box1_Pl500_V2 wmf Box5_PL500 wmf 8 2 3 4 5 A B C D E 7 9 1 6...
Страница 227: ...F 67 F PL500 20S GB 67 74 04 07 9 2 Hydraulic system Result name signature Comments about scope of work Occasion MH Date...
Страница 229: ...F 69 F PL500 20S GB 69 74 04 07 9 4 Milling section Result name signature Comments about scope of work Occasion MH Date...
Страница 230: ...F 70 F PL500 20S GB 70 74 04 07 9 5 Water system Result name signature Comments about scope of work Occasion MH Date...
Страница 232: ...F 72 F PL500 20S GB 72 74 04 07 9 7 Other equipment Result name signature Comments about scope of work Occasion MH Date...