3.
Loosen the fastening screws (2) and remove the V-belt guard
(1).
4.
Slightly loosen the fastening screws (2) on both sides.
5.
Pull the engine carrier forward, remove and replace the V-
belt (1).
6.
Install the new V-belt and pull the engine carrier back.
7.
Tighten the fastening screws (1) on both sides.
8.
Check tension of V-belt, tighten if necessary.
ð
Compression measurement:
approx. 5 mm (0.2 in).
B-834-0144
1
2
Fig. 66
2
B-834-0170
1
Fig. 67
1
B-834-0171
Fig. 68
Fig. 69
Maintenance – Annually
DFP10D
78
Содержание DFP10D
Страница 6: ...Table of contents DFP10D 6...
Страница 7: ...1 Introduction Introduction DFP10D 7...
Страница 11: ...2 Technical data Technical data DFP10D 11...
Страница 15: ...3 Concerning your safety Concerning your safety DFP10D 15...
Страница 38: ...Concerning your safety Safety Components DFP10D 38...
Страница 39: ...4 Indicators and control elements Indicators and control elements DFP10D 39...
Страница 43: ...5 Checks prior to start up Checks prior to start up DFP10D 43...
Страница 50: ...Checks prior to start up Daily maintenance DFP10D 50...
Страница 51: ...6 Operation Operation DFP10D 51...
Страница 58: ...Operation Parking the machine in secured condition DFP10D 58...
Страница 59: ...7 Loading transporting the machine Loading transporting the machine DFP10D 59...
Страница 63: ...8 Maintenance Maintenance DFP10D 63...
Страница 88: ...Maintenance As required DFP10D 88...
Страница 89: ...9 Setting up refitting Setting up refitting DFP10D 89...
Страница 91: ...10 Troubleshooting Troubleshooting DFP10D 91...
Страница 95: ...11 Disposal Disposal DFP10D 95...
Страница 97: ......
Страница 98: ......