
11
Dymax UVCS 2.0 Light-Curing Conveyor User Guide
11.
Position the Power Supply(ies) on the C
onveyor’s
Mounting Stand or in a location near the Conveyor.
Attach the Connector Cable leading from the RF Detector to the J-105A Receptacle on the back of the
Master Power Supply. Attach the cables leading from the back of the Conveyor to the J-105B and J-
106 Receptacles of the Master Power Supply (Figure 10). These cables are labeled to aid in assembly.
Figure 10. Power Supplies (back)
12.
For dual-Fusion units, connect the Jumper Cable between J-107 of the Master Power Supply and J-
106 of the Slave Power Supply. Install the Jumper Plug in J-105A of the Slave Power Supply.
13.
Connect the other end of the Irradiator Cable to the J-103 and J-104 Receptacles of the Power
Supply(ies). Connect the Power Cord to the back of the Power Supply and to a 208-240-Volt Power
Source.
14.
Plug in the Conveyor and turn it on. When the Conveyor is operating, and the Belt is in motion, turn
the Power Supply on by closing the Breakers on both of the Power S
upply’s
Front Panels.
15.
Turn the Irradiators on by pressing the Lamp On Button of the Master Power Supply (Figure 11). Both
the Master and the Slave Power Supplies will go through a warm-up cycle. The Blower inside the
Irradiators will turn on and the Lamps will ignite. The Lamps reach full intensity within 5 seconds
after ignition. Your UVCS Conveyor is now ready for operation.
Figure 11. Power Supply (front)