- 10 -
Base Section to Tilt Base
Place the Lower Base Section into the holes of the mounted Tilt Base and loosely install the Tilt
Base mounting hardware shown in
Figure 6
. Leave the flange nuts and Nyloc nuts slightly loose.
Figure - 6
Using a wrench or nut driver, securely tighten the two Nyloc nuts at the bottom of the Tilt Base.
Then loosen them one-quarter to one-half turn each. This will allow proper movement of the Tilt
Base while raising or lowering the antenna. It is not necessary to tighten these nuts more securely
unless further tilt operation is no longer required. They should not be loosened more than one-half
turn at any time.