- 9 -
Using
Figure 4
, attach the aluminum backing plate to the back of the insulated channel. The base
hardware kit contains four 2" hex head bolts, four flat washers, four aluminum spacers, four split
washers and four nuts. From the inside of the channel, insert a 2" hex head bolt with a flat washer
through each of the middle four holes, through the backing plate. Put on the aluminum spacer, a
split washer and a plain hex nut. Tighten firmly, but not enough to crush the insulated channel.
Figure - 4
Install the lower section to the insulated channel using the two 2" x 3/8" U-Bolts, two saddle
clamps, four 3/8" flat washers, four 3/8" split washers, and four 3/8" hex nuts as shown in
Figure 6
.
The base section tube should extend 1" beyond the bottom of the insulated channel.
The feedpoint hardware should be coming out on the left side as you look at the lower section as
shown in
Figure 5
.
When tightening, observe the split washers. When they fully seat (flatten out), the clamp is tight
enough. Any clamp should be tightened evenly from side-to-side with an equal amount of thread
above each nut.
Figure 5