![Dvorak SPIDER MINI II Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/dvorak/spider-mini-ii/spider-mini-ii_service-manual_2544110030.webp)
30
/
102
SM-8 Ev3/08072015
-
Loosen the chain by upper tightenning pulley
-
Release securing bolt M8x20 of the upper pulley
-
Release tensioning bolt M6x45 and loosen the chain
-
Loosen the steering chain by lower tightening pulley
-
Release securing bolt M8x20 of the lower pulley
-
Release tensioning bolt M6x45 and loosen the chain
-
Remove one chain pulley on the left side from the hydraulic motor, bolt M8x110 with self securing nut M8
CAUTION! check assembly position of both pulleys – longer recessing against each other
Содержание SPIDER MINI II
Страница 5: ...5 102 SM 8 Ev3 08072015 Wheel hub puller Ampere meter CEM DT 9701 Voltmeter Ben electronic DT 830 D...
Страница 9: ...9 102 SM 8 Ev3 08072015 3 BASIC TECHNICAL SPECIFICATIONS...
Страница 77: ...77 102 SM 8 Ev3 08072015 connector of the beacon Release wiring on the girder cut out all tie straps...
Страница 90: ...90 102 SM 8 Ev3 25062015 7 2 Electric circuit diagram...