6
TUF 800 WALL CLADDING
Birds Eye View
D008
= Rivet
= 30mm Clout
Step 2:
NOTE:
It is very important that the Wall
Sheets are positioned exactly as shown in
the
cladding detail
diagram on the previous
page.
Position Corner Wall Sheets. Check that the
Lip is on the correct side of the sheet. While
holding Corner Wall Sheet flush with the top
of the Top Plate, nail to plate using only one
30mm clout top and bottom.
Step 3:
Select Wall Sheet marked D008. Position at
right hand side of doorway. Rivet to Corner
Wall Sheet, one rivet top and bottom. Posi-
tion and rivet in place all remaining Wall
Sheets ensuring they overlap correctly.
While holding Front Wall Sheets up against
Top Plate Flashing, nail to top and bottom
plates using 30mm clouts.
Step 5:
Drill a hole through Door Jamb Flashings
and Wall Sheets top and bottom. Nail with
50mm nails
(fig. 1)
.
Nail left hand Door Jamb Flashing to Stud
using three 30mm Clouts at equal spacings
(fig. 1)
. Beside each 30mm Clout, rivet
Door Jamb Flashing to Rib. Repeat with
right hand Door Jamb Flashing.
Step 4:
Nail Wall Sheets to Plates, two 30mm Clouts per pan top and bottom.
Nail Wall Sheets to Wall Nogs, one clout per pan.