5
TUF 800 WALL CLADDING
fig. 1
fig. 2
To Avoid Corrosion:
Where at all possible try not to trap metal filings between two sheets. Remove all metal filings before riveting.
Carbon in pencils reacts with the Zinc/Aluminium coating on steel. Use ink to mark steel.
Step 1:
Door Jambs: Position left hand Door Jamb Flashing at
correct measurement from left
(cladding detail)
and nail
to Top Plate using a 30mm clout. Do not fit 50mm nails at
this stage. Pre-drill holes to make nailing easier
(fig. 1)
.
Position Door Jamb Flashing and nail at the bottom. Posi-
tion right hand Door Jamb Flashing 903mm from left
hand Door Jamb Flashing
(cladding detail)
and nail in
place.
903mm
1015mm
D008
CLADDING DETAIL
Birds Eye View
FRONT VIEW
DOOR JAMB
FLASHING