2. Jump Station Installation
www.dashrsystems.com
Results You Can Trust
The Dashr|
Jump
system is currently designed to integrate with the Vertec vertical
jump measurement device. But this system will work with any vane based vertical
jump measurement system if you find a way to attach it.
Step 1: Remove the screw and washer that connects the white plastic cylinder at
the base of the vanes.
Step 2: Use the screw and washer to attach the
Dashr|
Jump
ball-joint coupler.
Step 3: Use the ¼-20 threads to attach the Jump
module to the coupler. Note that the plastic nut
on the coupler can be used to tighten the
connection.
Make sure that the LED is oriented
towards the ground. The power cable will need
to be inserted prior to final alignment.
Step 4: Use the Velcro strips (supplied) to
attach the rechargeable Dashr battery to
the Vertec.
1. Download our App
Dashr uses a mobile application to control Dashr hardware and display testing
results. The free
Dashr
App can be downloaded from both the Google Play Store
and the Apple App Store. If you do not have an account, please visit
dashboard.dashrsystems.com
to create one.
Dashr|
Jump
Components
www.dashrsystems.com
Email: [email protected]
Phone: 844.44.DASHR
Jump
U
SER
M
ANUAL
Required Tools
More instructions and videos can be
found on our website at
www.dashrsystems.com
.
Visit us online to learn more ways to
make testing easier and more efficient.
LED for command
verification with App
¼-20 thread for
mounting to the
ball joint
Barrel Jack
power plug
Battery level indicator
USB ports
Power cable
Vertec attachment
point
Cylinder for Vertec
vane reset tool
B
al
l joi
n
t
ad
justmen
t
to
al
ign
modul
e