background image

DURATUF PREMIUM SHED WARRANTY

 

GUARANTEE TO CUSTOMER

 

Congratulations on purchasing a Duratuf Storage Shed. With proper care and attention, this product will last many years.

 

For your benefit 

PLEASE READ THE FOLLOWING INFORMATION CAREFULLY.

 

 

 

WARRANTY ON METAL CLADDING

 

Riverlea Group Ltd guarantee that the metal roofing and wall cladding on Kiwi and Fortress Garden Sheds may be used in moderate and 

inland corrosion zones or areas where the first year mild steel corrosion rate is less than 200g/m2, and that in these conditions, they will 

not perforate due to corrosion within 30 years of date of manufacture.

 

 

 

TERMS AND CONDITIONS

 

1.

 

Damage or corrosion due to the following circumstances is not covered by this warranty.

 

 

Mechanical, chemical or other damage sustained during or after installation.

 

 

 

   

NOTE: 

Clean swarf off shed 

IMMEDIATELY

 after assembly

 

 

 

   Do 

NOT 

mark cladding with pencil

 

 

 

   Do 

NOT 

allow manures, chemicals or other corrosive materials to have direct contact with cladding

 

 

 

   Chemical damage will result if these instructions are not carried out

 

 

Force majeure or other causes beyond the control of Riverlea Group Ltd.

 

 

2.

 

This warranty does not cover material installed in severe and very severe environmental situations, or in any area where the mild 

steel corrosion rate (as published by BRANZ) exceeds 200g/m2.

 

3.

 

Minimum maintenance must be carried out in accordance with instructions below.

 

 

Should the cladding fail to perform as specified above, the liability of Riverlea Group Ltd shall in all cases be limited to replacing or      

repairing the defective product. The balance of the original warranty will cover any repaired or replaced material. Riverlea Group Ltd will 

not be liable for any consequential loss or damage, labour or transport charges. All claims made in writing within 21 days of discovery, 

quoting the reference number at the top right hand corner of this page.

 

 

 

 

MAINTENANCE

 

 

Following are the minimum maintenance requirements for cladding used in Kiwi Garden Sheds and Fortress Sheds. 

 

 

Washing all surfaces by rain, and annual hosing of sheltered areas using a hose and soft nylon brush.

 

 

Within 2km of coast—wash every 3 months as above. After a storm, wash the cladding and the gutters as soon as possible 
to remove any highly corrosive salt deposits.

 

 

Volcanic Ash Fallout—wash as soon as possible, removing fallout from roof and gutters

 

 

Gutters to be kept clean of leaves and dirt.

 

 

Should you require additional technical information please contact us at the details below.

 

Please visit http://www.riverleagroup.co.nz/warranty

-

garden

-

sheds to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team will help you to acti-
vate the warranty on your garden shed.

 

 

Many thanks, from the Team at Riverlea Group.

 

WARRANTY REGISTRATION

 

Содержание SHEDS MK2

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK2 BASE SIZE 2545mm x 1715mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 3: ...150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel For Gable ends only Window Hardware Pack 2 000m 1 000m 1 000m 1 175m 1 Roof Sheets Flat Roof Sheet Clea...

Страница 4: ...LLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 785 2545 45 45 45 FRONT WALL 883 45 795 45 785 45 45 1205 2545 45 45 45 BACK WALL 883 45 1205 1900 or 1870 for Raised Base Plate only 1900 or 1870...

Страница 5: ...e over onto its base Pieces of timber from the packaging may be used to temporarily brace the frame before rolling it over Position 1 625 End Wall Nogs 883m down from Top Plate and nail in place If fi...

Страница 6: ...N To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a win...

Страница 7: ...tack in place Re peat with remaining sheet Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan...

Страница 8: ...ll holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Страница 9: ...tom Plates and hard against Stud Attach Door Jamb Flashing with three rivets into Rib on the outside and three 30mm clouts into studs on the inside Repeat with the other Door Jamb Step 3 Fit Corner Fl...

Страница 10: ...hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops in u...

Страница 11: ...to Back Top Plate Repeat at the front Note The 6 x 50mm Clouts on end ribs are covered by the Barge Flashings Step 2 Position first Roof Sheet centrally over Ridge Beam on the right hand end of shed w...

Страница 12: ...r panel to ridge beam using one 30mm clout per pan Position on ridge beam and screw in place using six 50mm roofing screws Screw one 50mm roofing screw into ridge beam through each rib on overlap one...

Страница 13: ...straight then rivet to Roof one rivet every second Rib Note MK2 shown Note MK2 shown MK2 FLOOR Optional Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is...

Страница 14: ...into Joists Measure and cut Floor Flashing 110 to fit in between Door Jamb Flash ings and nail in place using 50mm Clouts MK2 HASP STAPLE Using six rivets and one 50mm clout attach hasp to Door Jamb F...

Страница 15: ...on a purpose built floor concrete cob bles ply etc the Wall Sheets will protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15...

Страница 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Отзывы: