MK2 LOUVRE WINDOW (Optional)

 

Step 2:

 

On  the  inside  of  the  shed,  position  studs 
and  Nog  centrally  on  window  opening. 
Make  sure  the  studs  are  parallel  and  nail 
into Top Plate and End Wall Nog.

 

Step 3:

 

Nail  wall  Sheets  to  window  framing  using 
30mm  clouts.  (return  to  step  4  on  page  7 
and  complete).  Then  fit  Window  Frame). 
Position  Window  Frame  centrally  on  win-
dow  opening  and  rivet  it  to  ribs.  Pre

-

drill 

holes  in  each  corner  and  nail  Window 
Frame to framing, using 50mm nails.

 

Step 4:

 

If  the  Window  is  in  the  gable  end,  tempo-
rarily  position  the  Over  Panel  above  Win-
dow  Frame.  Following  the  same  angle  as 
the gable, mark and cut to suit.

 

Step 5:

 

Rivet  Over  Panel  to  the  Window  Frame 
with rivets.

 

588mm

 

Step 1:

 

Lay out the two window studs (883mm) and 
Nog  (634mm)  on  a  flat  surface.  Position 
Nog and nail in place using 2x 75mm nails 
at each end.

 

Step 6:

 

From  the  inside  of  the  shed,  slide  Louvre 
Glass  into  Louvre  Units  attached  to  the 
Window  Frame.  Bend  up  tabs  to  keep 
Glass in position.

 

50mm

 

NAILS

 

RIVITS

 

Содержание SHEDS MK2

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK2 BASE SIZE 2545mm x 1715mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 3: ...150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel For Gable ends only Window Hardware Pack 2 000m 1 000m 1 000m 1 175m 1 Roof Sheets Flat Roof Sheet Clea...

Страница 4: ...LLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 785 2545 45 45 45 FRONT WALL 883 45 795 45 785 45 45 1205 2545 45 45 45 BACK WALL 883 45 1205 1900 or 1870 for Raised Base Plate only 1900 or 1870...

Страница 5: ...e over onto its base Pieces of timber from the packaging may be used to temporarily brace the frame before rolling it over Position 1 625 End Wall Nogs 883m down from Top Plate and nail in place If fi...

Страница 6: ...N To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a win...

Страница 7: ...tack in place Re peat with remaining sheet Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan...

Страница 8: ...ll holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Страница 9: ...tom Plates and hard against Stud Attach Door Jamb Flashing with three rivets into Rib on the outside and three 30mm clouts into studs on the inside Repeat with the other Door Jamb Step 3 Fit Corner Fl...

Страница 10: ...hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops in u...

Страница 11: ...to Back Top Plate Repeat at the front Note The 6 x 50mm Clouts on end ribs are covered by the Barge Flashings Step 2 Position first Roof Sheet centrally over Ridge Beam on the right hand end of shed w...

Страница 12: ...r panel to ridge beam using one 30mm clout per pan Position on ridge beam and screw in place using six 50mm roofing screws Screw one 50mm roofing screw into ridge beam through each rib on overlap one...

Страница 13: ...straight then rivet to Roof one rivet every second Rib Note MK2 shown Note MK2 shown MK2 FLOOR Optional Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is...

Страница 14: ...into Joists Measure and cut Floor Flashing 110 to fit in between Door Jamb Flash ings and nail in place using 50mm Clouts MK2 HASP STAPLE Using six rivets and one 50mm clout attach hasp to Door Jamb F...

Страница 15: ...on a purpose built floor concrete cob bles ply etc the Wall Sheets will protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15...

Страница 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Отзывы:

Похожие инструкции для SHEDS MK2