background image

MK2 FIXED WINDOW (Optional)

 

9

 

Step 1:

 

Lay out the two window studs (883mm) and Nog 
(590mm) on a flat surface. Position Nog and nail 
in place using two 75mm nails at each end.

 

570mm

 

Step 6:

 

From the outside of the shed, place glass in Win-
dow  Frame.  Attach  a Glazing  Bead (G100)  with 
three rivets to each side of the Window Frame to 
hold glass in place. Pre

-

drilling Glazing Beads is 

recommended.

 

Follow Steps 2 

-

 5 on page 8.

 

MK2 DOOR JAMB & CORNER FLASHINGS

 

Step 1:

 

Fit Door Jamb Flashing (104) in between Top and 
Bottom Plates and hard against Stud. Attach Door 
Jamb  Flashing  with  three  rivets  into  Rib  on  the 
outside  and  three  30mm  clouts  into  studs  on  the 
inside. Repeat with the other Door Jamb.

 

Step 3:

 

Fit Corner Flashing (101) over corner Ribs with the top 
flush with the top of the Top Plate. Rivet in place with 
six  rivets,  three  each  side.  Repeat  with  other  three 
Corner  Flashings.  When  fitting  Corner  Flashings  on 
front wall, ensure they are parallel with Door Jambs.

 

Step 2:

 

Measure  and  cut  Doorstep  Flashing  (106)  to  fit  in 
between  Door  Jambs.  Position  the  Doorstep  Flash-
ing  in  between  the  Door  Jambs  at  bottom  of  door-
way,  nail  through  top  of  flashing  using  three  30mm 
Clouts. Repeat with the Overdoor Flashing (105).

 

Содержание SHEDS MK2

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK2 BASE SIZE 2545mm x 1715mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 3: ...150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel For Gable ends only Window Hardware Pack 2 000m 1 000m 1 000m 1 175m 1 Roof Sheets Flat Roof Sheet Clea...

Страница 4: ...LLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 785 2545 45 45 45 FRONT WALL 883 45 795 45 785 45 45 1205 2545 45 45 45 BACK WALL 883 45 1205 1900 or 1870 for Raised Base Plate only 1900 or 1870...

Страница 5: ...e over onto its base Pieces of timber from the packaging may be used to temporarily brace the frame before rolling it over Position 1 625 End Wall Nogs 883m down from Top Plate and nail in place If fi...

Страница 6: ...N To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a win...

Страница 7: ...tack in place Re peat with remaining sheet Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan...

Страница 8: ...ll holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Страница 9: ...tom Plates and hard against Stud Attach Door Jamb Flashing with three rivets into Rib on the outside and three 30mm clouts into studs on the inside Repeat with the other Door Jamb Step 3 Fit Corner Fl...

Страница 10: ...hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops in u...

Страница 11: ...to Back Top Plate Repeat at the front Note The 6 x 50mm Clouts on end ribs are covered by the Barge Flashings Step 2 Position first Roof Sheet centrally over Ridge Beam on the right hand end of shed w...

Страница 12: ...r panel to ridge beam using one 30mm clout per pan Position on ridge beam and screw in place using six 50mm roofing screws Screw one 50mm roofing screw into ridge beam through each rib on overlap one...

Страница 13: ...straight then rivet to Roof one rivet every second Rib Note MK2 shown Note MK2 shown MK2 FLOOR Optional Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is...

Страница 14: ...into Joists Measure and cut Floor Flashing 110 to fit in between Door Jamb Flash ings and nail in place using 50mm Clouts MK2 HASP STAPLE Using six rivets and one 50mm clout attach hasp to Door Jamb F...

Страница 15: ...on a purpose built floor concrete cob bles ply etc the Wall Sheets will protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15...

Страница 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Отзывы: