11

 

MK2 ROOF

 

Note:

 

Condensation can form on the under side of shed roof. If building paper is required, fit now. Building paper will 

need to be supported by netting or roofing twine.

 

Step 1:

 

Check that the diagonal measurements of the shed are the same. If building on unlevel ground it may be neces-

sary to temporarily brace the shed with pieces of timber from the packaging.

 

Step 3:

 

Starting from the left hand end, centralize Roof 
on  Ridge  Beam.  Ensure  Roof  is  tight  against 
end  Wall  Sheets,  predrill  then  nail  one  50mm 
Clout  through  Rib  into  the  Ridge  Beam.  At  the 
back,  line  up  Ribs  on  the  Roof  Sheet  with  the 
Ribs  on  Wall  Sheet.  Using  one  50mm    Clout, 
nail through Rib into Back Top Plate. Repeat at 
the front.

 

Note The 6 x 50mm Clouts on end ribs are covered by 

the Barge Flashings.

 

 

Step 2:

 

Position  first  Roof  Sheet  centrally  over  Ridge 
Beam  on  the  right  hand  end  of  shed  with  the 
LIP  on  the  left  hand  side.  (For  sheds  with  a 
Clear Roof Panel, go to the next page). Position 
the next Roof Sheet. Ensure it overlaps correct-
ly  then  rivet  together,  400mm  down  from  the 
centre  on  both  sides.  Fit  remaining  Roof 
Sheets.

 

Step 4:

 

Centralize  Roof  at  the  other  end  and  nail 
through  Rib  into  the  Ridge  Beam  and  Top 
Plates,  using  50mm  Clouts.  Ensure  Ridge 
Beam  is  straight,  then  Screw  one  50mm  Roof-
ing  Screw  into  Ridge  Beam  through  each  Rib 
on overlap (one screw per sheet). At the back, 
set up a String Line in centre of Top Plate. En-
sure Top Plate is straight and screw, using one 
50mm  Roofing  Screw  per  Rib.  Repeat  at  the 
front.

 

LIP

 

50mm Clout 

 

Roofing screws

 

Содержание SHEDS MK2

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK2 BASE SIZE 2545mm x 1715mm...

Страница 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 3: ...150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel For Gable ends only Window Hardware Pack 2 000m 1 000m 1 000m 1 175m 1 Roof Sheets Flat Roof Sheet Clea...

Страница 4: ...LLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 785 2545 45 45 45 FRONT WALL 883 45 795 45 785 45 45 1205 2545 45 45 45 BACK WALL 883 45 1205 1900 or 1870 for Raised Base Plate only 1900 or 1870...

Страница 5: ...e over onto its base Pieces of timber from the packaging may be used to temporarily brace the frame before rolling it over Position 1 625 End Wall Nogs 883m down from Top Plate and nail in place If fi...

Страница 6: ...N To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a win...

Страница 7: ...tack in place Re peat with remaining sheet Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan...

Страница 8: ...ll holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Страница 9: ...tom Plates and hard against Stud Attach Door Jamb Flashing with three rivets into Rib on the outside and three 30mm clouts into studs on the inside Repeat with the other Door Jamb Step 3 Fit Corner Fl...

Страница 10: ...hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops in u...

Страница 11: ...to Back Top Plate Repeat at the front Note The 6 x 50mm Clouts on end ribs are covered by the Barge Flashings Step 2 Position first Roof Sheet centrally over Ridge Beam on the right hand end of shed w...

Страница 12: ...r panel to ridge beam using one 30mm clout per pan Position on ridge beam and screw in place using six 50mm roofing screws Screw one 50mm roofing screw into ridge beam through each rib on overlap one...

Страница 13: ...straight then rivet to Roof one rivet every second Rib Note MK2 shown Note MK2 shown MK2 FLOOR Optional Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is...

Страница 14: ...into Joists Measure and cut Floor Flashing 110 to fit in between Door Jamb Flash ings and nail in place using 50mm Clouts MK2 HASP STAPLE Using six rivets and one 50mm clout attach hasp to Door Jamb F...

Страница 15: ...on a purpose built floor concrete cob bles ply etc the Wall Sheets will protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15...

Страница 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Отзывы: