Drill 13/64” holes in Floor Channel every 12 inches.
Wood Deck:
Caulk the underside of the Floor Channel covering all of the drilled holes and mitered cor-
ners. You must use the #10 x 1” hex head screws with the Magni 599 coating supplied by Dura-Bilt every 12
inches.
Concrete Patio:
1. Use Floor Channel as a pattern to mark screw
locations on concrete.
2. Remove Channel and use a 1/4” masonry drill bit
and drill holes 1-1/4” deep.
4. Hammer Plastic Lag Shields into holes.
5. Caulk the bottom of the Floor channel then Replace Floor Channel
over the Plastic Lag Shields and Fasten with #10 x 1” screws.
Page 7
All reasonable efforts must be made to make all the Floor Channel level.
Caution:
The mitered Corner pieces must match perfectly because the vertical Corner Joiner extrusion will be
a tight fi t in both directions in the fl oor channel.
All Channel joints must butt tightly together.
Helpful Hint: Place a long straight edge against edge of separate sections of Channel to assure perfect
alignment. When the Floor Channel positioning is correct, you are ready to fasten Floor Channel to deck.
The cut out for the swinging door will be made after the door is located.
Left Corner
Right Corner
Note: Corner Joiners will install only as
shown with the notch at the top.
(Applicable for Straight Line Roofs.)
Notch
Notch
Содержание Deluxe Three -Season Sunroom
Страница 4: ...Page 3 Room Assembly...