Installing a Room Under a Fixed Roof
(This is a special application)
1. Start by cutting four (4) pieces of 1-1/2” x 1-1/4” x 1/16” thick
angle so it will fi t between the Floor and the bottom of
the Mounting Rail.
(You will need (2) pieces for the right wall and (2) for the left wall)
2. Drill (5) 13/64” holes thru the 1-1/4” leg of the angle in all (4) pieces,
2” down from the top and 2” up from the bottom with the
last (3) holes equally spaced between the fi rst two holes.
See drawing.
3. Apply a strip of 1” x 1” foam tape
on the back
of
1-1/4” side of the angle approx. 1/16” in from the
1-1/2” side of the angle.
(This is to be done to (2) pieces of angle)
Note: Left wall is opposite.
See drawing.
Page 12
Right Wall
Shown
4. Place the inside leg of the 1-1/2” angle against
Line “A”
that has been already established on page 6 then use a level
to plumb the angle, then attach to the home with #12 x 2”
screws, compressing the foam.
See drawing at right.
(The foam fi lls in the gaps of siding or shingles etc.)
5. Install the Floor Channel by placing it against the 1-1/2”
leg of the angle you just attached to the wall. Make sure the
Floor Channel is square with the home and fasten with
#10 x 1” screws.
See drawings on next page.
6. Install your fi rst Window or Door Panel into the Floor Channel
and slide it to the home wall.
7. Install 1-1/2” x 1-1/4” x 1/16” thick angle against the left side
of the Floor Channel, making sure it’s plumb at the home wall and
fasten with #10 x 1-1/2” hex head white screws.
8. Repeat Steps 4, 5 and 6 for the left side wall.
Note:
All other trim angles will be applied when the room is assembeled.
See next page for more assembly examples.
Line “A”
Home Wall
Top View of
Right Wall at Home
1-1/2” Side
Содержание Deluxe Three -Season Sunroom
Страница 4: ...Page 3 Room Assembly...