www.factorybuysdirect.com
200245-01G
12
INSTALLATION
BUILT-IN FIREPLACE INSTALLATION
Figure 9 - Rough Opening for Wall
Installation
Figure 7 - Clearance to Combustibles
Figure 8 - Fireplace Clearances
3/4" Clearance to Facia
Note: Height of fireplace opening on facia to be 30
1
/
2
"
1
3
/
8
" Clearance to Sides, Back and Top
36
1
/
2
"
37
3
/
4
"
WARNING: Do not allow any
combustible materials to overlap
the firebox front.
WARNING: Do not allow
combustible or noncombustible
materials to cover any necessary
openings like louvered slots.
WARNING: Never modify or
cover the louvered slots on the
front of the firebox.
Built-in installation of this fireplace involves
installing fireplace into a framed-in enclosure.
This makes the front of the fireplace flush
with wall. If installing a built-in mantel above
the fireplace, you must follow the clearances
shown in Figure 7.
NOTICE: Surface temperatures
of adjacent walls and mantels
become hot during operation.
Walls and mantels above the
fireplace may become hot to the
touch. If installed properly, these
temperatures meet the require
-
ment of the national product
standard. Follow all minimum
clearances shown in this manual
(see Figure 7).
1. Frame in rough opening. Use dimensions
shown in Figure 8 for the rough opening.
If installing in a corner, use dimensions
shown in Figure 10 (page 13) for the rough
opening. The height is 32
1
/
2
", which is
the same as the wall opening above (see
Figure 9).
2. Carefully set fireplace in front of rough
opening with back of fireplace inside wall
opening.
Bottom Edge of
Vent Hood
2
1
/
2
"
2"
4"
7"
8"
10"
12"
Note: All vertical measurements
are from lower edge of vent
hood to bottom of mantel shelf.
42" to
Ceiling
Safe
Zone
Mantel
Shelf
14" 16"
18"
35"
32
1
/
2
"
19"